Buscar
Mostrando ítems 1-4 de 4
Diseño de un modelo de mejora continua de la gestión de proyectos para Anónima Operadora de Pensiones Complementarias
(Instituto Tecnológico de Costa Rica, 2011)
The study explores the continuous improvement of the project management processes in ANÓNIMA OPC. The problem was defined as the identification of the features that a continuous improvement model must have, in order to ...
Propuesta de Marco de Trabajo para el Estudio Sistémico de Riesgos en Proyectos.
(Instituto Tecnológico de Costa Rica, 2011)
This project was an investigation of two concepts, the first project management
as the proposed PMI in PMBOK and the other, systemic thinking, which are
studied situations (problems) as a system and observe their behavior ...
"Plan de Proyecto para Desarrollo de El Albergue de Montaña El Roble"
(Instituto Tecnológico de Costa Rica, 2011)
Breneto S.A. is a society which owns a piece of land of 17 hectares in Cartago.
The board is interested in developing a tourism project in the area; it will be like a
small mountain hotel. It is required a feasibility ...
Manual de Control Interno para la Empresa Propietaria de la Red S.A.
(Instituto Tecnológico de Costa Rica, 2011)
Dentro del enfoque moderno de administración, la función de control ha tomado un papel importante, por lo que actualmente se considera un elemento de importancia relevante que facilita el logro de los objetivos propuestos ...