Tecnológico de Costa Rica
  • How to publish in Repositorio TEC?
  • Policies
  • Educational Resources
  • Contact us
    • español
    • English
  • English 
    • español
    • English
  • Login
View Item 
  •   Repository Home
  • Trabajos de Graduación
  • Biblioteca José Figueres Ferrer
  • Escuela de Ingeniería en Construcción
  • Licenciatura en Ingeniería en Construcción
  • View Item
  •   Repository Home
  • Trabajos de Graduación
  • Biblioteca José Figueres Ferrer
  • Escuela de Ingeniería en Construcción
  • Licenciatura en Ingeniería en Construcción
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Browse

All RepositoryCommunities & CollectionsBy Issue DateAuthorsTitlesKeywordEducational Resource TypeIntended UserThis CollectionBy Issue DateAuthorsTitlesKeywordEducational Resource TypeIntended User

My Account

LoginRegister

Statistics

View Usage Statistics

Monitoreo y control de la aplicación del procedimiento 8P02 Proyectos y adecuación de espacios del sistema de Gestión de Calidad de Los Arallanes S.A, según la norma ISO 9001 – 2015, en los procesos constructivos.

Thumbnail
View/Open
monitoreo_control_aplicacion_procedimiento_proyectos_adecuacion_espacios_sistema_gestion_calidad_arallanes.pdf (1.336Mb)
Date
2018
Author
Ferreto-Alfaro, Karolina
Metadata
Show full item record
Abstract
Quality management and the implementation of project management in construction companies are key for success, since it proves that the industry can generate products and / or services that meet customer requirements. However, it is necessary to build culture of quality in the organization, including all the coworkers and the management team. This project must be kept under constant study and updating. Therefore, the objective of this paper, consists in the process of control & monitoring of the application of the 8P02 Projects and Adequacy of Spaces Procedure and PMBOK Guide, which belongs to the integrated quality management system of Los Arallanes S.A. Due the necessity of the engineering department, to evaluate its efficiency and the conformity of the processes regarding the procedure. The ISO 9001: 2015 standard was studied, the 8P02 Project and adaptation of spaces and the PMBOK Guide, the data of the assigned construction projects was analyzed, those projects were followed up and informal interviews were carried out with key personnel. . A total of 91 non-compliances regarding forms was identified, the absence of a record of non-compliant departures and non-conformities, concluding that the procedure required modifications, which were created and a proposal for the new procedure was presented.
Description
Proyecto de Graduación (Licenciatura en Ingeniería en Construcción) Instituto Tecnológico de Costa Rica, Escuela de Ingeniería en Construcción, 2018.
URI
https://hdl.handle.net/2238/10051
Share
       
Metrics
Collections
  • Licenciatura en Ingeniería en Construcción [553]

|Contact us

Repositorio Institucional del Tecnológico de Costa Rica

Sistema de Bibliotecas del TEC | SIBITEC

© DERECHOS RESERVADOS. Un sitio soportado por DSpace(v. 6.3)

RT-1

 

 


|Contact us

Repositorio Institucional del Tecnológico de Costa Rica

Sistema de Bibliotecas del TEC | SIBITEC

© DERECHOS RESERVADOS. Un sitio soportado por DSpace(v. 6.3)

RT-1