Tecnológico de Costa Rica
  • How to publish in Repositorio TEC?
  • Policies
  • Educational Resources
  • Contact us
    • español
    • English
  • English 
    • español
    • English
  • Login
View Item 
  •   Repository Home
  • Trabajos de Graduación
  • Biblioteca José Figueres Ferrer
  • Escuela de Ingeniería Electromecánica
  • Licenciatura en Mantenimiento Industrial
  • View Item
  •   Repository Home
  • Trabajos de Graduación
  • Biblioteca José Figueres Ferrer
  • Escuela de Ingeniería Electromecánica
  • Licenciatura en Mantenimiento Industrial
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Browse

All RepositoryCommunities & CollectionsBy Issue DateAuthorsTitlesKeywordEducational Resource TypeIntended UserThis CollectionBy Issue DateAuthorsTitlesKeywordEducational Resource TypeIntended User

My Account

LoginRegister

Statistics

View Usage Statistics

Estudio de viabilidad financiera, ambiental y energética para la sustitución de una de las calderas de búnker por una de biomasa en la Planta San Rafael de la empresa Cargill Costa Rica

Thumbnail
View/Open
estudio_viabilidad_financiera_ambiental_energetica_sustitucion_calderas_bunker_biomasa_planta_san_rafael_empresa_cargill_costa_rica.pdf (2.246Mb)
Date
2018
Author
Romero-Arias, Jorge Alberto
Metadata
Show full item record
Abstract
This investigation is focused on the viability of the installation of a biomass boiler system to reduce the environmental impact and dependence on fuel delivery while also gaining an annual savings for the company of Cargill San Rafael Plant (PIPASA). The project begins with a data collection of fuel oil and steams demands to measure the plant’s energy consumption and also the environmental impact it generates and the high annual payments for fuel. It allows to consider different scenarios to propose a more viable solution. The average energy consumption of the plant is 10 922 350 MJ, an average consumption of 269 144 L of monthly bunker, 10 050 metric tons of global warming gases emitted per year. The annual fuel purchase is $1 617 535 and a monthly consumption of 7 tons of steam per hour which is obtained from the performance of a dual schedule to simultaneously observe the work of the steam consuming equipment. The project it’s based on a comprehensive level with a mixed source design (documentary and field). Once the consumption mentioned above is established, we proceeded to analyze the possible fuels to replace the bunker, which are LPG and biomass (pellet and chip). Then the necessary capacity of the boiler to be installed was established (9-ton hour steam boiler), considering consumption peaks and the low consumption of the plant.
Description
Proyecto de Graduación (Licenciatura en Mantenimiento Industrial) Instituto Tecnológico de Costa Rica, Escuela de Ingeniería Electromecánica, 2018
URI
https://hdl.handle.net/2238/10461
Share
       
Metrics
Collections
  • Licenciatura en Mantenimiento Industrial [286]

|Contact us

Repositorio Institucional del Tecnológico de Costa Rica

Sistema de Bibliotecas del TEC | SIBITEC

© DERECHOS RESERVADOS. Un sitio soportado por DSpace(v. 6.3)

RT-1

 

 


|Contact us

Repositorio Institucional del Tecnológico de Costa Rica

Sistema de Bibliotecas del TEC | SIBITEC

© DERECHOS RESERVADOS. Un sitio soportado por DSpace(v. 6.3)

RT-1