Buscar
Mostrando ítems 1-10 de 25
Rendimientos de la mano de obra por horas-hombre en el área de construcción de viviendas para la empresa constructora MAVACON
(Instituto Tecnológico de Costa Rica, 2007)
The following project measures labor work performance in house building for MAVACON Construction Company.
The main objective is to obtain the performance of labor work per worker in an hour time, to apply as a tool in ...
Plan de mantenimiento prenventivo en la infraestructura en el Instituto Tecnológico de Costa Rica
(Instituto Tecnológico de Costa Rica, 2007)
The following report is the development of a preventive maintenance plan for the I.T.C.R headquarters. The institution does not have a preventive plan properly planned and in most cases only apply corrective actions to the ...
Plan de mantenimiento preventivo de infraestructura en el Instituto Tecnológico de Costa Rica
(Instituto Tecnológico de Costa Rica, 2007)
of a preventive maintenance plan for the I.T.C.R headquarters. The institution does not have a preventive plan properly planned and in most cases only apply corrective actions to the events, to carry out this work is the ...
Metodologías para la gestión y el manejo de resíduos en obras de infraestructura en la empresa EDICA Ltda.
(Instituto Tecnológico de Costa Rica, 2007)
This project was created because the company EDICA Ltda. had the necessity to establish guidelines and documentation in order to incorporate new environmental policies within the constructive processes. "Overall Plan for ...
Análisis de sensibilidad técnica y económica aplicados a construcción.
(Instituto Tecnológico de Costa Rica, 2007)
Construction is an activity subject to contingencies during the project execution stage. In large construction works, it is also subject to changes in the market during the constructive period. This document presents a ...
Sistemas de Abastecimiento de Agua en la Zona Indígena Cabécar-Chirripó
(Instituto Tecnológico de Costa Rica, 2007)
This project consists on the design of water supply systems in the indigenous zone Chirripó-Cabécar.
Within the objectives of this project it is to put in practice appropriate alternative technologies. Has is for aqueducts ...
Sistemas de control de erosión en la subestructura de puentes
(Instituto Tecnológico de Costa Rica, 2007)
This Project is in the area of river
Hydraulics, giving a solution to a
particular problem of erosion at the
bridge over the Barranca River. It also
attempts to raise conscience of the
bridge maintenances necessity. ...
Optimización del sistema de distribución de agua potable en la Comunidad de Marsella
(Instituto Tecnológico de Costa Rica, 2007)
The main objective of this project is to
establish the technical and feasible
criteria necessary for the optimization
process of Marsella`s Water-Distribution-
System, a rural community located in La
Venecia de San ...
Implementación en procesos constructivos de métodos de calidad utilizados a nivel industrial
(Instituto Tecnológico de Costa Rica, 2007)
This work is of nature investigative and I practice, the same one treats on a diagnosis of the qualities processes that they are applied to constructive level in building firms of housings in series, to implement procedures ...
Valoración del Cumplimiento de la Norma de Acreditación INTE-ISO/IEC 17025:2005 en tres Ensayos de Laboratorio de la Empresa Concretos Orosi S.A.
(Instituto Tecnológico de Costa Rica, 2007)
The specialty practice focuses in analyzing the quality and efficiency of the laboratory of Concretos Orosi S.A. This laboratory is dedicated to the tests of the product that offers the company and it does not offer external ...