Buscar
Mostrando ítems 531-540 de 561
Optimización estructural de un edificio con marcos de concreto reforzado, utilizando el método de capacidad espectral, comparando los resultados de la modelación con plasticidad concentrada y distribuida
(Instituto Tecnológico de Costa Rica, 2020)
A 5 story concrete frame building analysis and design were perform following the static method described in CSCR 2010/14 (CFIA, 2016) and satisfy all requirements for concrete structures in section 8 of CSCR 2010/14 (CFIA, ...
Análisis y determinación teórica de la rigidez de muros de mampostería reforzada en edificios de hasta dos niveles
(Instituto Tecnológico de Costa Rica, 2011)
The project consists of the analysis and determination of the theoretical relative stiffness of reinforced masonry walls of buildings up to two levels to compare the results obtained manually and those obtained in the ...
Análisis técnico económico de dos alternativas de diseño de los duques de alba de la Terminal de Transbordadores de Playa Naranjo
(Instituto Tecnológico de Costa Rica, 2011)
El presente trabajo tiene como fin presentar un estudio de la condición actual de las estructuras de atraque de la Terminal de Transbordadores de Playa Naranjo y realizar un diseño de los duques de alba necesarios para ...
Comparación de diseño estructural para cimentaciones superficiales utilizando el método rígido convencional y el método Winkler por elementos finitos
(Instituto Tecnológico de Costa Rica, 2020)
El objetivo principal de este proyecto es el determinar si existe una diferencia en el diseño y costos constructivos de cimentaciones aisladas cuadradas para edificios de entre 2 y 5 pisos de altura al usar dos metodologías ...
Medición y mejoramiento de la productividad en la colocación de obra falsa, el montaje de elementos prefabricados y colado de entrepiso del condominio vertical residencial Q-BO
(Instituto Tecnológico de Costa Rica, 2016)
This project consist was conducted in the building of the vertical residence condominium Q-BO, in charge of the construction company “HSolís”, which has more than 20 levels of apartments and an outbuilding to be used for ...
Mejoramiento del proceso de producción y optimización de agregados producidos en el quebrador Las Flores del Chirripó
(Instituto Tecnológico de Costa Rica, 2010)
Different solutions are presented to improve the quality of concrete aggregates, which are generated in the production process in Constructora Navarro breaker, based on mobile equipment that allow the transfer to any place ...
Desarrollo de una herramienta de planificación del tiempo y aseguramiento de la calidad para la construcción de un edificio habitacional, en la Empresa Constructora Edificar S.A.
(Instituto Tecnológico de Costa Rica, 2014)
This practice was developed in Torres de Flared, which consists of a residential building nine levels, each consisting of four apartments. The scope of the construction company contemplates gray work, electromechanical, ...
Zonificación y caracterización geotécnica de los suelos de la sede central del Instituto Tecnológico de Costa Rica
(Instituto Tecnológico de Costa Rica, 2017)
The present investigation comprises a progressive development of different stages that begin with the compilation and analysis of geotechnical studies of the buildings of the headquarters of Technoligical of Costa Rica. ...
Implementación y Validación de un Plan de Mantenimiento Existente para Inmuebles ICE
(Instituto Tecnológico de Costa Rica, 2012)
This document contains procedures used to implement and validate the Model Plan for Building Maintenance for Instituto Costarricense de Electricidad (ICE); which was designed by engineer. Pablo Camacho in 2009 but has not ...
Análisis, Diseño y Ejecución de un Control de Costos Reales para un Proyecto de Construcción
(Instituto Tecnológico de Costa Rica, 2007)
The developed work consists, in first instance, evaluating the existing methodology for the control of costs, in a construction company and, to determine thus; if this mechanism provides useful information that it allows ...