Buscar
Mostrando ítems 1-10 de 95
Metodología para la evaluación de la seguridad estructural de puentes
(Instituto Tecnológico de Costa Rica, 2018)
The objective of the present work is to show the methodology to perform a reliability analysis in a prestressed concrete girder bridge, based on deformation data obtained from a diagnostic load test.
It was developed three ...
Gestión de proyectos en la fase de planeación, control y seguimiento para la constructora TR Grupo Empresarial S.A.
(Instituto Tecnológico de Costa Rica, 2018)
The work developed consists of the intervention of the project management processes by the construction company TR Grupo Empresarial S.A. The objective is to develop a methodology for project management focused on the ...
Factores que afectan la construcción de alcantarillado sanitario para la Constructora Fernández Vaglio S.A.
(Instituto Tecnológico de Costa Rica, 2018)
The work presented below is based on the determination of factors that affect the construction of a sanitary pipeline project, to propose tools and methods to be able to reduce the elements identified to the maximum. To ...
Análisis del desempeño de una mezcla asfáltica con fibra de bambú
(Instituto Tecnológico de Costa Rica, 2019)
La investigación se dirigió hacia el análisis del desempeño mecánico de una mezcla asfáltica con fibra de bambú como posible material natural y sostenible que aporte resistencia a la mezcla. En este caso, la fibra funcionó ...
Ejecución de la construcción del reforzamiento del edificio del centro comercial Plaza Wong
(Instituto Tecnológico de Costa Rica, 2016)
This final graduation project entitled
"Implementation of the construction of the
reinforcement of the building of the Plaza Wong
shopping center" is an informative document
about the construction process necessary to ...
Inventario e inspección de 10 puentes ubicados en las rutas cantonales de San Ramón de Alajuela
(Instituto Tecnológico de Costa Rica, 2018)
The main objective of this work is to inventory and inspect ten bridges belonging to roadways which are administered by San Ramon’s Municipal Administration. The bridges are located at San Rafael and Santiago districts. ...
Monitoreo y control de la aplicación del procedimiento 8P02 Proyectos y adecuación de espacios del sistema de Gestión de Calidad de Los Arallanes S.A, según la norma ISO 9001 – 2015, en los procesos constructivos.
(Instituto Tecnológico de Costa Rica, 2018)
Quality management and the implementation of project management in construction companies are key for success, since it proves that the industry can generate products and / or services that meet customer requirements. ...
Implementación de la metodología de planificación y control “Last Planner” en el proyecto de construcción: Unidad Productiva San Rafael
(Instituto Tecnológico de Costa Rica, 2017)
The main purpose of this project is to implement a planning and control system to improve the fulfillment of the activities that constitute a construction project for a period of 10 weeks. The Last Planner System (LPS) ...
Verificación del diseño y control de la construcción de las vigas y dinteles del Viaducto para el proyecto de Circunvalación Norte del CONAVI
(Instituto Tecnológico de Costa Rica, 2019)
El presente trabajo de graduación para optar por
el grado de licenciatura se realizó como Práctica
Profesional Dirigida en la entidad pública CONAVI,
encargada de administrar, ejecutar y darle
mantenimiento a la ...
Evaluación estructural e integral de postes de madera de distribución eléctrica en la zona de Turrialba, a cargo de la Región Huetar Caribe del ICE
(Instituto Tecnológico de Costa Rica, 2019)
El desarrollo del presente documento, tiene como objetivo, indicar la cantidad de postes de madera que continúan en servicio, que requieren de mantenimiento o que deben ser reemplazados, a partir de la evaluación integral ...