Modelo estructural calibrado y análisis dinámico del Edificio Central del Instituto Costarricense de Electricidad
(Instituto Tecnológico de Costa Rica, 2017)
The building that serves as the headquarters of
the Costa Rican Institute of Electricity (ICE, for its
initials in Spanish) was built between 1969 and
1972. Due to its 40 plus years of service life, and
the lack of a ...
Guía de gestión de la calidad para los proyectos constructivos de la empresa Navarro y Avilés S.A.
(Instituto Tecnológico de Costa Rica, 2017)
In this paper the project to opt for the Construction
Engineering Licenciature grade at Instituto
Tecnológico de Costa Rica is presented, under the
modality of directed professional practice, carried
out in Navarro y ...
Implementación de la metodología de planificación y control “Last Planner” en el proyecto de construcción: Unidad Productiva San Rafael
(Instituto Tecnológico de Costa Rica, 2017)
The main purpose of this project is to implement a planning and control system to improve the fulfillment of the activities that constitute a construction project for a period of 10 weeks. The Last Planner System (LPS) ...
Análisis de la productividad y rendimiento de la mano de obra para algunas actividades constructivas del sistema electromecánico en Torres de Parqueo UCR
(Instituto Tecnológico de Costa Rica, 2017)
The objective in the development of this
graduation project is to establish the performance
and productivities of the labor in constructive
activities of the electromechanical part in charge
of the company CMC contratista ...
Zonificación y caracterización geotécnica de los suelos de la sede central del Instituto Tecnológico de Costa Rica
(Instituto Tecnológico de Costa Rica, 2017)
The present investigation comprises a progressive development of different stages that begin with the compilation and analysis of geotechnical studies of the buildings of the headquarters of Technoligical of Costa Rica. ...