Search
Now showing items 1-10 of 35
Metodología para la administración de los materiales de la Constructora Adelante Desarrollos S.A.
(Instituto Tecnológico de Costa Rica, 2017)
The following report presents a proposal of improvement to the administration and use of the materials in the construction Company Adelante Desarrollos S.A. We choose three types of housing as an object of study, which ...
Mejoramiento de procesos constructivos en muros de la Empresa Constructora Volio y Trejos
(Instituto Tecnológico de Costa Rica, 2017)
Measuring how much production is obtained when constructing is an issue that has been increasing little by little along with construction companies because they seek to optimize expenses and increase profit every day.
The ...
Análisis y mejoramiento de procesos constructivos, en los proyectos de la empresa VIVICON
(Instituto Tecnológico de Costa Rica, 2017)
The objective of this document is to determine
the productivity and performance of two
building processes within the masonry work of
two residential condominiums (Avenir and
Cedro Real) built by Vivicon S.A.
These two ...
Diseño de propuestas constructivas Soil Nailing para estabilidad de taludes en sitios de la Red Nacional de Telecomunicaciones del ICE
(Instituto Tecnológico de Costa Rica, 2017)
This document contains information about the design of constructive proposals stabilization of slopes and hillsides sites of the Red Nacional de Telecomunicaciones in the Instituto Costarricense de Electricidad (ICE), ...
Implementación de software de análisis y diseño en el proyecto de consultoría: Diseño de la Ampliación de las Rutas Nacionales Nos. 3 y 106, sección: Barreal-Lagunilla-Valencia, para la empresa IMNSA Ingenieros Consultores S.A.
(Instituto Tecnológico de Costa Rica, 2017)
The need to implement specialized software in the number and spatial analysis of road infrastructure projects gave rise to the present graduation project. The implementation of software allowed to simplify and streamline ...
Implementación de la metodología de planificación y control “Last Planner” en el proyecto de construcción: Unidad Productiva San Rafael
(Instituto Tecnológico de Costa Rica, 2017)
The main purpose of this project is to implement a planning and control system to improve the fulfillment of the activities that constitute a construction project for a period of 10 weeks. The Last Planner System (LPS) ...
Análisis de la productividad y rendimiento de la mano de obra para algunas actividades constructivas del sistema electromecánico en Torres de Parqueo UCR
(Instituto Tecnológico de Costa Rica, 2017)
The objective in the development of this
graduation project is to establish the performance
and productivities of the labor in constructive
activities of the electromechanical part in charge
of the company CMC contratista ...
Zonificación y caracterización geotécnica de los suelos de la sede central del Instituto Tecnológico de Costa Rica
(Instituto Tecnológico de Costa Rica, 2017)
The present investigation comprises a progressive development of different stages that begin with the compilation and analysis of geotechnical studies of the buildings of the headquarters of Technoligical of Costa Rica. ...
Plan para la mejora en la gestión de los procesos de programación, elaboración de presupuesto, control y calidad de obra en la Empresa D’QS S.A.S. de Medellín, Colombia
(Instituto Tecnológico de Costa Rica, 2017)
The developed work consists in the intervention of four constructive process from the company D’QS S.A.S. in Medellín, Colombia. The objective is to develop an integral plan for improve the management of the processes of ...
Aplicación de Lean Construction a través de la metodología Last Planner a proyectos de vivienda social de FUPROVI
(Instituto Tecnológico de Costa Rica, 2017)
The present paper consists on the final report of the graduation project, which consisted on designing the procedure for the application of Last Planner System® (LPS) and perform a pilot application on a project under ...