Plan para la mejora en la gestión de los procesos de programación, elaboración de presupuesto, control y calidad de obra en la Empresa D’QS S.A.S. de Medellín, Colombia
(Instituto Tecnológico de Costa Rica, 2017)
The developed work consists in the intervention of four constructive process from the company D’QS S.A.S. in Medellín, Colombia. The objective is to develop an integral plan for improve the management of the processes of ...
Propuesta del gestión de costo para los proyectos de la Constructora Hermanos Brenes S.A.
(Instituto Tecnológico de Costa Rica, 2016)
The work presented below, is the
development of a proposal for cost control
processes Doña Blanca condominium
infrastructure of its first stage, developed
by the company Constructora Hermanos
Brenes S.A
The main ...
Aplicación de Lean Construction a través de la metodología Last Planner a proyectos de vivienda social de FUPROVI
(Instituto Tecnológico de Costa Rica, 2017)
The present paper consists on the final report of the graduation project, which consisted on designing the procedure for the application of Last Planner System® (LPS) and perform a pilot application on a project under ...
Guía para procedimientos de trámite de permisos en proyectos infraestructura hospitalaria para la CCSS
(Instituto Tecnológico de Costa Rica, 2012)
The construction of hospital infrastructures represents a great challenge from the planning stage, execution, pursuit, control and closes, since interdisciplinary equipment like doctors, architects, engineers and other ...
Mejoramiento de los procesos de mantenimiento y control de calidad en la infraestructura de los recintos portuarios del Incop, particularmente Caldera
(Instituto Tecnológico de Costa Rica, 2015)
The present project proposes an alternative to improve and facilitate the inspection works done at Instituto Costarricense de Puertos del Pacífico (Costa Rican Institute of Pacific Ocean Ports). This will be achieved through ...
Herramienta para la Gestión de Proyecto desde la Perspectiva de la Oficina de Ingeniería
(Instituto Tecnológico de Costa Rica, 2016)
According to the problems identified in the Office
of Engineering Technology of Costa Rica, in the
work of project control, it took place this
Professional Practice in order to identify
weaknesses facing and propose a ...
Aplicaciones de aeronaves no tripuladas en el control de avance de obras civiles.
(Instituto Tecnológico de Costa Rica, 2017)
The purpose of this research is to create a
methodology that facilitates and speed up the
collection of data in order to quantifiably determine
the progress of construction work, through the use
of drones and commercial ...
Control de costos en edificio de tres niveles
(Instituto Tecnológico de Costa Rica, 2017)
The purpose of this study is to improve and strengthen the cost control system of Grupo Condeco Vac S.A. The development starts with an analysis of the actual situation of the company this was generated with a compilation ...
Diseño de un modelo para el control de costos reales de una construcción
(Instituto Tecnológico de Costa Rica, 2002)
The purpose of this work was to establish a procedure that allows the user to have all the information about the actual costs for one or more construction projects accurately and on time. It also pretends to minimize the ...
Guía Integrada de Gestión de Calidad en Proyectos para la Unidad de Casos Individuales de la Fundación Promotora de Vivienda (FUPROVI)
(Instituto Tecnológico de Costa Rica, 2019)
Este documento presenta el informe final del
proyecto de graduación para optar por el título de
Licenciatura en Ingeniería en Construcción, este
consistió en la creación de una Guía Integrada de
Gestión de Calidad para ...