Tecnológico de Costa Rica
  • How to publish in Repositorio TEC?
  • Policies
  • Educational Resources
  • Contact us
    • español
    • English
  • English 
    • español
    • English
  • Login
View Item 
  •   Repository Home
  • Trabajos de Graduación
  • Biblioteca José Figueres Ferrer
  • Escuela de Ingeniería en Construcción
  • Licenciatura en Ingeniería en Construcción
  • View Item
  •   Repository Home
  • Trabajos de Graduación
  • Biblioteca José Figueres Ferrer
  • Escuela de Ingeniería en Construcción
  • Licenciatura en Ingeniería en Construcción
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Browse

All RepositoryCommunities & CollectionsBy Issue DateAuthorsTitlesKeywordEducational Resource TypeIntended UserThis CollectionBy Issue DateAuthorsTitlesKeywordEducational Resource TypeIntended User

My Account

LoginRegister

Statistics

View Usage Statistics

Control de insumos, personal y avance de obra para el proyecto "Rehabilitación del puente sobre el Río Sarapiquí" Puerto Viejo de Sarapiquí, Ruta Nacional # 4

Thumbnail
View/Open
Control_Insumos_Personal_Avance_Proyecto_Rehabilitación_Puente_Rio_Sarapiqui_RutaNacional4.pdf (8.022Mb)
Date
2015
Author
Castro-Sánchez, Roberto
Metadata
Show full item record
Abstract
This report contains the results of the creation of a cost control tool developed by Microsoft Access ®, the results that are possible to obtain by making use of it and a brief description of the use and handling of the tool are presented. The tool is used in the bridge rehabilitation project on the Sarapiquí River, National Route # 4 consists of an intervention of sub and super structure, however the activities discussed are reinforcing steel, the project creating access and conditioning and protection of a slope. The developed tool allows the engineer in charge of the project in different fields of construction meet the actual cost of the activities carried out, the material still has, among others, so you can take decisions that are required on the course of the project. The use of the tool for future projects allows the engineer to know indirectly yields, costs and project delivery times, so also will allow you foresee them in the best way in upcoming projects.
Description
Proyecto de Graduación (Licenciatura en Ingeniería en Construcción) Instituto Tecnológico de Costa Rica, Escuela de Ingeniería en Construcción, 2015.
URI
https://hdl.handle.net/2238/6064
Share
       
Metrics
Collections
  • Licenciatura en Ingeniería en Construcción [552]

|Contact us

Repositorio Institucional del Tecnológico de Costa Rica

Sistema de Bibliotecas del TEC | SIBITEC

© DERECHOS RESERVADOS. Un sitio soportado por DSpace(v. 6.3)

RT-1

 

 


|Contact us

Repositorio Institucional del Tecnológico de Costa Rica

Sistema de Bibliotecas del TEC | SIBITEC

© DERECHOS RESERVADOS. Un sitio soportado por DSpace(v. 6.3)

RT-1