Mostrar el registro sencillo del ítem

dc.contributor.advisorLeandro-Hernández, Ana Gretteles
dc.contributor.authorCamacho-Piedra, Douglas
dc.date.accessioned2016-11-15T16:33:06Z
dc.date.available2016-11-15T16:33:06Z
dc.date.issued2016
dc.identifier.urihttps://hdl.handle.net/2238/6725
dc.descriptionProyecto de Graduación (Licenciatura en Ingeniería en Construcción) Instituto Tecnológico de Costa Rica, Escuela de Ingeniería en Construcción, 2016.es
dc.description.abstractThis research seeks to analyze productivity and obtain yields of selected TICS building construction processes and identify factors that low productivity, also, helps creating and feeding a database that allows computing the cost of labor from yields, which represents important information for the Engineering Office to estimate costs for change orders of future projects. Initially, activities were selected by techniques such as Pareto diagram and classifications A, B, C and Alpha, Beta, Gamma, based on the economic impact they generate. Moreover, the analysis was based on a field study, from which processes information was extracted to measure productivity and to analyze affecting factors, also calculate performance under the amount of work done. From the study of the three selected activities, structural column-walls, concrete beams and mezzanines, results of low productivity for processes such as manufacturing and casting concrete were obtained, but productivities with acceptable ranks for steel reinforcement construction, were got; thus could be identified factors and causes of low productivity. With the yields obtained, a database to calculating workforce costs was performed. Among the conclusions that could be obtained is that the size of the working groups can be reduced to optimize processes, besides, yields are unrelated to productivity, since at lower yields, higher productivity.es
dc.description.sponsorshipInstituto Tecnológico de Costa Rica.es
dc.language.isospaes
dc.publisherInstituto Tecnológico de Costa Ricaes
dc.subjectProductividades
dc.subjectRendimientoes
dc.subjectCostoes
dc.subjectMano de obraes
dc.subjectBase de datoses
dc.titleAnálisis de procesos constructivos, medida de productividad y rendimientos en el edificio TIC’S del ITCRes
dc.typelicentiateThesises


Ficheros en el ítem

Thumbnail
Thumbnail
Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem