Tecnológico de Costa Rica
  • How to publish in Repositorio TEC?
  • Policies
  • Educational Resources
  • Contact us
    • español
    • English
  • English 
    • español
    • English
  • Login
View Item 
  •   Repository Home
  • Trabajos de Graduación
  • Biblioteca José Figueres Ferrer
  • Escuela de Química
  • Licenciatura en Ingeniería Ambiental
  • View Item
  •   Repository Home
  • Trabajos de Graduación
  • Biblioteca José Figueres Ferrer
  • Escuela de Química
  • Licenciatura en Ingeniería Ambiental
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Browse

All RepositoryCommunities & CollectionsBy Issue DateAuthorsTitlesKeywordEducational Resource TypeIntended UserThis CollectionBy Issue DateAuthorsTitlesKeywordEducational Resource TypeIntended User

My Account

LoginRegister

Statistics

View Usage Statistics

Estudio de pre-factibilidad de la transformación de residuos orgánicos municipales en energía

Thumbnail
View/Open
TFG Maybi Rojas.pdf (3.427Mb)
Date
2017
Author
Rojas-Soto, Maybi Patricia
Metadata
Show full item record
Abstract
Energy generation from renewable energy sources is an alternative to the effects of climate change caused by the use of fossil fuels. In this case, the use of garden waste from the Municipality of Escazú for the generation of electricity through a gasification process was proposed, in a fluidized bed system using air as gasifying agent. For the estimation of the energy production, the chemical process simulation software ASPEN HYSYS was used, considering the characterization of the waste, complemented with values reported in literature. The results of the simulation allowed to determine the characteristics of the synthesis gas (syngas) and the power of the proposed system. In addition, these data were compared with those of the gasifier from the Forestal Engineering Department of the Instituto Tecnológico de Costa Rica (TEC) and with the theoretical performance of the selected equipment. The gasification for the proposed design would have a production of 3120 kWh for a consumption of 4 tonnes per month of garden waste. Based on the economic analysis considering self-consumption scenario, it was obtained a 5,6-year investment recovery period and a 8.88% rate of return for a discount rate of 5.0%, meaning that the gasification plant is a viable project.
Description
Proyecto de Graduación (Licenciatura en Ingeniería Ambiental) Instituto Tecnológico de Costa Rica, Escuela de Química, 2017.
URI
https://hdl.handle.net/2238/7373
Share
       
Metrics
Collections
  • Licenciatura en Ingeniería Ambiental [206]

|Contact us

Repositorio Institucional del Tecnológico de Costa Rica

Sistema de Bibliotecas del TEC | SIBITEC

© DERECHOS RESERVADOS. Un sitio soportado por DSpace(v. 6.3)

RT-1

 

 


|Contact us

Repositorio Institucional del Tecnológico de Costa Rica

Sistema de Bibliotecas del TEC | SIBITEC

© DERECHOS RESERVADOS. Un sitio soportado por DSpace(v. 6.3)

RT-1