Tecnológico de Costa Rica
  • How to publish in Repositorio TEC?
  • Policies
  • Educational Resources
  • Contact us
    • español
    • English
  • English 
    • español
    • English
  • Login
View Item 
  •   Repository Home
  • Trabajos de Graduación
  • Biblioteca José Figueres Ferrer
  • Escuela de Ingeniería en Construcción
  • Licenciatura en Ingeniería en Construcción
  • View Item
  •   Repository Home
  • Trabajos de Graduación
  • Biblioteca José Figueres Ferrer
  • Escuela de Ingeniería en Construcción
  • Licenciatura en Ingeniería en Construcción
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Browse

All RepositoryCommunities & CollectionsBy Issue DateAuthorsTitlesKeywordEducational Resource TypeIntended UserThis CollectionBy Issue DateAuthorsTitlesKeywordEducational Resource TypeIntended User

My Account

LoginRegister

Statistics

View Usage Statistics

Implementación de la filosofía Lean en la producción de concreto con autohormigonera

Thumbnail
View/Open
implementacion_filosofia_lean_produccion_concreto.pdf (5.893Mb)
Date
2017
Author
Cruz-Rosales, Christopher
Metadata
Show full item record
Abstract
The following investigation seeks the Lean philosophy implementation on the concrete production process with a self-propelled mixer, developing a methodology that involves Lean tools. At the beginning, the necessary requirements for the methodology were determined, advantages and disadvantages of operating with the equipment, too. Then, the information control and evaluation tools before, during, and after the concrete production process were developed. Once the control tools are settled, the concrete production process without a Lean Construction implementation was evaluated through travel diagrams, flow diagrams and value stream mapping. Also, a productivity analysis of the concrete placement process was made. A costs analysis used all the previous information and showed unbearable losses for the enterprise. With this on mind, the spotted improvements were implemented and, using Lean, there were improvements on the processes that went over a 50%, and the costs were lowered in a 30%, which made them bearable for the company. After the implementation, decision making tools for the equipment use on future projects were created.
Description
Proyecto de Graduación (Licenciatura en Ingeniería en Construcción) Instituto Tecnológico de Costa Rica, Escuela de Ingeniería en Construcción, 2017.
URI
https://hdl.handle.net/2238/9944
Share
       
Metrics
Collections
  • Licenciatura en Ingeniería en Construcción [553]

|Contact us

Repositorio Institucional del Tecnológico de Costa Rica

Sistema de Bibliotecas del TEC | SIBITEC

© DERECHOS RESERVADOS. Un sitio soportado por DSpace(v. 6.3)

RT-1

 

 


|Contact us

Repositorio Institucional del Tecnológico de Costa Rica

Sistema de Bibliotecas del TEC | SIBITEC

© DERECHOS RESERVADOS. Un sitio soportado por DSpace(v. 6.3)

RT-1