Plan de Gestión de Calidad en el Proyecto Aporte la Flor del Proyecto Hidroeléctrico Toro 3 utilizando la guía PMI
(Instituto Tecnológico de Costa Rica, 2012)
The present paper was performed under the Directed Professional Practice mode to opt for a Degree in Construction Engineering.
The project was developed in Proyecto Toro 3 ICE, in the construction of the Aporte La Flor, ...
Guía para procedimientos de trámite de permisos en proyectos infraestructura hospitalaria para la CCSS
(Instituto Tecnológico de Costa Rica, 2012)
The construction of hospital infrastructures represents a great challenge from the planning stage, execution, pursuit, control and closes, since interdisciplinary equipment like doctors, architects, engineers and other ...