Plan de mantenimiento prenventivo en la infraestructura en el Instituto Tecnológico de Costa Rica
(Instituto Tecnológico de Costa Rica, 2007)
The following report is the development of a preventive maintenance plan for the I.T.C.R headquarters. The institution does not have a preventive plan properly planned and in most cases only apply corrective actions to the ...
Estimación de Costos para la Construcción de un Gimnasio Multiuso por Etapas.
(Instituto Tecnológico de Costa Rica, 2007)
This project involves the development of detailed cost estimates and inspection of economic gyms type. Through it, seek to create a database containing materials list, activities, and total unit costs, which allows to ...
Estudio de productividad y rendimientos en procesos constructivos, mediante el uso de Grúa Torre
(Instituto Tecnológico de Costa Rica, 2007)
This project consisted of developing an analysis of the productivity and yields related to the operation of the tower crane. This included a breakdown of the principal activities that realizes its time designation during ...
Presupuesto y base de datos de precios unitarios para la remodelación y ampliación de laboratorio de productos farmacéuticos de la C.C.S.S.
(Instituto Tecnológico de Costa Rica, 2007)
Se busca desarrollar un presupuesto detallado con el fin de remodelar y ampliar los de servicios sanitarios, comedor y oficinas, para el laboratorio de productos farmacéuticos ubicado en la Uruca. Asimismo, con el cálculo ...
“Optimización del montaje de estructuras prefabricadas de concreto“
(Instituto Tecnológico de Costa Rica, 2007)
El siguiente proyecto trata sobre la medición y
optimización del montaje de estructuras
prefabricadas de concreto en los sistemas R-Plus
o Naves Industriales y el sistema Horizontal a
Flexión de la empresa Estructuras ...
Análisis de sensibilidad técnica y económica aplicados a construcción.
(Instituto Tecnológico de Costa Rica, 2007)
Construction is an activity subject to contingencies during the project execution stage. In large construction works, it is also subject to changes in the market during the constructive period. This document presents a ...
Plan de mantenimiento preventivo de infraestructura en el Instituto Tecnológico de Costa Rica
(Instituto Tecnológico de Costa Rica, 2007)
of a preventive maintenance plan for the I.T.C.R headquarters. The institution does not have a preventive plan properly planned and in most cases only apply corrective actions to the events, to carry out this work is the ...
Metodologías para la gestión y el manejo de resíduos en obras de infraestructura en la empresa EDICA Ltda.
(Instituto Tecnológico de Costa Rica, 2007)
This project was created because the company EDICA Ltda. had the necessity to establish guidelines and documentation in order to incorporate new environmental policies within the constructive processes. "Overall Plan for ...
Implantación y Calibración del Presiómetro Ménard para estimación de capacidad de soporte y deformabilidad de suelos en cimentaciones de proyectos ICE.
(Instituto Tecnológico de Costa Rica, 2007)
The pressuremeter test is used in situ soil testing.
The test consist of placing a cylindrical probe in a
borehole with a diameter that allows the probe to
be in contact with the soil.
The active part of the pressuremeter ...
Rendimientos de la mano de obra por horas-hombre en el área de construcción de viviendas para la empresa constructora MAVACON
(Instituto Tecnológico de Costa Rica, 2007)
The following project measures labor work performance in house building for MAVACON Construction Company.
The main objective is to obtain the performance of labor work per worker in an hour time, to apply as a tool in ...