Buscar
Mostrando ítems 1-10 de 25
Rendimientos de la mano de obra por horas-hombre en el área de construcción de viviendas para la empresa constructora MAVACON
(Instituto Tecnológico de Costa Rica, 2007)
The following project measures labor work performance in house building for MAVACON Construction Company.
The main objective is to obtain the performance of labor work per worker in an hour time, to apply as a tool in ...
Plan de mantenimiento prenventivo en la infraestructura en el Instituto Tecnológico de Costa Rica
(Instituto Tecnológico de Costa Rica, 2007)
The following report is the development of a preventive maintenance plan for the I.T.C.R headquarters. The institution does not have a preventive plan properly planned and in most cases only apply corrective actions to the ...
Sistemas de Abastecimiento de Agua en la Zona Indígena Cabécar-Chirripó
(Instituto Tecnológico de Costa Rica, 2007)
This project consists on the design of water supply systems in the indigenous zone Chirripó-Cabécar.
Within the objectives of this project it is to put in practice appropriate alternative technologies. Has is for aqueducts ...
Sistemas de control de erosión en la subestructura de puentes
(Instituto Tecnológico de Costa Rica, 2007)
This Project is in the area of river
Hydraulics, giving a solution to a
particular problem of erosion at the
bridge over the Barranca River. It also
attempts to raise conscience of the
bridge maintenances necessity. ...
Optimización del sistema de distribución de agua potable en la Comunidad de Marsella
(Instituto Tecnológico de Costa Rica, 2007)
The main objective of this project is to
establish the technical and feasible
criteria necessary for the optimization
process of Marsella`s Water-Distribution-
System, a rural community located in La
Venecia de San ...
Valoración del Cumplimiento de la Norma de Acreditación INTE-ISO/IEC 17025:2005 en tres Ensayos de Laboratorio de la Empresa Concretos Orosi S.A.
(Instituto Tecnológico de Costa Rica, 2007)
The specialty practice focuses in analyzing the quality and efficiency of the laboratory of Concretos Orosi S.A. This laboratory is dedicated to the tests of the product that offers the company and it does not offer external ...
Diseño e implementación de un Sistema de Control de Costos
(Instituto Tecnológico de Costa Rica, 2007)
The object of this project was to develop a system to keep control of the expenses made by the company in each project.
In order to achieve these objective several sheets of Microsoft Excel were programmed.
As a result, ...
Estimación de Costos para la Construcción de un Gimnasio Multiuso por Etapas.
(Instituto Tecnológico de Costa Rica, 2007)
This project involves the development of detailed cost estimates and inspection of economic gyms type. Through it, seek to create a database containing materials list, activities, and total unit costs, which allows to ...
Automatización del método de evaluación simplificado de corrosión de la estructura de concreto armado
(Instituto Tecnológico de Costa Rica, 2007)
The researches to increst the durability of reinforced concrete structure and to extend the structure development have find a big trouble because its structure has the inconvenience of being potentially susceptible to be ...
“Optimización del montaje de estructuras prefabricadas de concreto“
(Instituto Tecnológico de Costa Rica, 2007)
El siguiente proyecto trata sobre la medición y
optimización del montaje de estructuras
prefabricadas de concreto en los sistemas R-Plus
o Naves Industriales y el sistema Horizontal a
Flexión de la empresa Estructuras ...