Tecnológico de Costa Rica
  • ¿Cómo publicar en el Repositorio TEC?
  • Políticas
  • Recursos Educativos
  • Contáctenos
    • español
    • English
  • español 
    • español
    • English
  • Login
Ver ítem 
  •   Página Principal
  • Trabajos de Graduación
  • Biblioteca José Figueres Ferrer
  • Escuela de Ingeniería en Construcción
  • Licenciatura en Ingeniería en Construcción
  • Ver ítem
  •   Página Principal
  • Trabajos de Graduación
  • Biblioteca José Figueres Ferrer
  • Escuela de Ingeniería en Construcción
  • Licenciatura en Ingeniería en Construcción
  • Ver ítem
JavaScript is disabled for your browser. Some features of this site may not work without it.

Listar

Todo el RepositorioComunidades & ColeccionesPor fecha de publicaciónAutoresTítulosPalabras clavesTipo de Recurso EducativoDestinatarioEsta colecciónPor fecha de publicaciónAutoresTítulosPalabras clavesTipo de Recurso EducativoDestinatario

Mi cuenta

AccederRegistro

Estadísticas

Ver Estadísticas de uso

Modelo para la programación y control del plazo, costo y calidad de proyectos, para la empresa Carlos Mata Arquitectura y Construcción LTDA

Thumbnail
Ver/
TF9153_BIB304767_Rodolfo_Rodriguez_Varela.pdf (2.069Mb)
Fecha
2021-11
Autor
Rodríguez-Varela, José Rodolfo
Metadatos
Mostrar el registro completo del ítem
Resumen
Este proyecto consistió en realizar un modelo para mejorar la programación y el control de proyectos en la empresa Carlos Mata Arquitectura y Construcción, para lograrlo este trabajo se enfocó en alcanzar 4 objetivos específicos. El primero, consistió en realizar un estudio de la información de proyectos anteriores realizados por la empresa, para luego hacer un diagnóstico de su situación. Para lo cual se tomó en cuenta presupuestos anteriores, cronogramas e información brindada directamente por el dueño. Posteriormente se hizo una investigación tanto bibliográfica como de empresas similares, sobre las buenas prácticas que se emplean en materia de programación y control. El objetivo de esta investigación fue determinar la brecha cualitativa que existe entre la empresa en estudio, lo que señala la bibliografía y las empresas que se encuentran en el mercado actual, además los resultados obtenidos se plasmaron en una matriz de análisis de brecha cualitativa. A partir del análisis que se hizo, se propusieron varias herramientas para conformar el modelo, dentro de las que podemos encontrar, un formato para la realización de presupuestos, una guía de usuario para el uso básico de MS Project, un formato para confeccionar flujos de caja y tablas de pagos, así como listas de chequeo para inspecciones de calidad y plazos, además, un formato para realizar registros fotográficos en obra. Finalmente se implementaron las herramientas en un proyecto ya finalizado de la empresa, donde por medio de la comparativa de los resultados obtenido anteriormente, contra los nuevos resultados, se logró concluir que el modelo es funcional para realizar una adecuada programación y control, alcanzando así la validación del mismo.
 
This project consisted of making a model to improve the programming and control of projects in the company Carlos Mata Arquitectura y Construction, to achieve this work focused on achieving 4 specific objectives. The first was to carry out a study of the information of previous projects carried out by the company, and then make a diagnosis of their situation. For which previous budgets, schedules and information provided directly by the owner were taken into account. Subsequently, both bibliographic and similar company research was carried out on the good practices used in programming and control. The objective of this research was to determine the qualitative gap that exists between the company under study, as the literature says and the companies that are in the current market, in addition the results obtained were reflected in a matrix of qualitative gap analysis. Based on the analysis that was made, several tools were proposed to shape the model, within which we can find, a format for making budgets, a user guide for the basic use of MS Project, a format for making cash flows and payment tables and checklists for quality inspections and deadlines, in addition to a format for making photographic records on site. Finally, the tools were implemented in an already completed project of the company and through the comparison of the results obtained previously, against the new results it was possible to conclude that the model is functional to carry out adequate programming and control, thus achieving the validation of the east.
 
Descripción
Proyecto de Graduación (Licenciatura en Ingeniería en Construcción) Instituto Tecnológico de Costa Rica, Escuela de Ingeniería en Construcción, 2021
URI
https://hdl.handle.net/2238/13860
Compartir
       
Métricas
Colecciones
  • Licenciatura en Ingeniería en Construcción [553]

Ítems relacionados

Mostrando ítems relacionados por Título, autor o palabras clave.

  • Construcción de planta demostrativa de control de velocidad de un servomotor utilizando instrumentación National Instruments 

    Barr-Gamboa, Joshua (Instituto Tecnológico de Costa Rica, 2016-11)
    La implementación de plataformas demostrativas que demuestren las capacidades de los equipos que una empresa produce y comercializa se ha vuelto una herramienta fundamental a la hora de realizar negocios. Una buena plataforma ...
  • Propuesta de un programa de control de exposición a altas temperaturas en los trabajadores de la Academia Nacional de Policía (Sede Pococí) del Ministerio de Seguridad Pública 

    Guerrero-Naranjo, Edith (Instituto Tecnológico de Costa Rica, 2022-06)
    El proyecto se realizó en la Academia Nacional de Policía en la Sede de Pococí, del Ministerio de Seguridad Pública. El objetivo de este proyecto fue proponer un programa de control de exposición a altas temperaturas para ...
  • Sistema de control automático por medio de visión para sistema de arrastre de microfilamentos PCL 

    Cordero-Ramírez, Daniel Andrés (Instituto Tecnológico de Costa Rica, 2021)
    La Escuela de Ciencia e Ingeniería de los Materiales es la encargada de diversos proyectos innovadores, entre ellos se encuentra “Desarrollo de un sistema de estudios in-vitro adaptable en equipo de pruebas dinámicas, con ...

|Contáctenos

Repositorio Institucional del Tecnológico de Costa Rica

Sistema de Bibliotecas del TEC | SIBITEC

© DERECHOS RESERVADOS. Un sitio soportado por DSpace(v. 6.3)

RT-1

 

 


|Contáctenos

Repositorio Institucional del Tecnológico de Costa Rica

Sistema de Bibliotecas del TEC | SIBITEC

© DERECHOS RESERVADOS. Un sitio soportado por DSpace(v. 6.3)

RT-1