Tecnológico de Costa Rica
  • How to publish in Repositorio TEC?
  • Policies
  • Educational Resources
  • Contact us
    • español
    • English
  • English 
    • español
    • English
  • Login
View Item 
  •   Repository Home
  • Trabajos de Graduación
  • Biblioteca José Figueres Ferrer
  • Escuela de Ingeniería en Construcción
  • Licenciatura en Ingeniería en Construcción
  • View Item
  •   Repository Home
  • Trabajos de Graduación
  • Biblioteca José Figueres Ferrer
  • Escuela de Ingeniería en Construcción
  • Licenciatura en Ingeniería en Construcción
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Browse

All RepositoryCommunities & CollectionsBy Issue DateAuthorsTitlesKeywordEducational Resource TypeIntended UserThis CollectionBy Issue DateAuthorsTitlesKeywordEducational Resource TypeIntended User

My Account

LoginRegister

Statistics

View Usage Statistics

Evaluación para la Rehabilitación del Puente de Calle Prusia

Thumbnail
View/Open
Evaluación_Rehabilitación_Puente_Calle_Prusia.pdf (51.65Mb)
Date
2012
Author
Castro-Briceño, Esteban
Metadata
Show full item record
Abstract
The evaluation for the rehabilitation of the bridge at Prusia Street is essential for the community, due to its touristic and agricultural importance. It must determine the maximum load that should carry the bridge and so the solutions to rehabilitate the bridge in study, this must include the economic impact. It is also important to highlight the critical elements present on de the bridge. To realize this task, it has to be used a software for design and analysis of structures named SAP 2000, also, Excel worksheets must be done for the review of the different stresses involved in the structure. The bridge in study turns not to be as bad as the Municipality presented it, so the only non destructive test realized was the ultrasound to determinate de section of a doubtful element. Besides, the studies determinate that the bridge doesn´t comply in terms of resistance and deflection with the AASHTO normative, since in most of the load cases the stress is greater than the capability of the section. The maximum load the bridge should manage is about 18 tons, so as an immediate action, the bridge should have a cleaning and painting of the structure, and also a substitution of the deck.
Description
Proyecto de Graduación (Licenciatura en Ingeniería en Construcción). Instituto Tecnológico de Costa Rica. Escuela de Ingeniería en Construcción, 2012.
URI
https://hdl.handle.net/2238/6102
Share
       
Metrics
Collections
  • Licenciatura en Ingeniería en Construcción [491]

|Contact us

Repositorio Institucional del Tecnológico de Costa Rica

Sistema de Bibliotecas del TEC | SIBITEC

© DERECHOS RESERVADOS. Un sitio soportado por DSpace(v. 6.3)

RT-1

 

 


|Contact us

Repositorio Institucional del Tecnológico de Costa Rica

Sistema de Bibliotecas del TEC | SIBITEC

© DERECHOS RESERVADOS. Un sitio soportado por DSpace(v. 6.3)

RT-1