Tecnológico de Costa Rica
  • ¿Cómo publicar en el Repositorio TEC?
  • Políticas
  • Recursos Educativos
  • Contáctenos
    • español
    • English
  • español 
    • español
    • English
  • Login
Ver ítem 
  •   Página Principal
  • Trabajos de Graduación
  • Biblioteca José Figueres Ferrer
  • Escuela de Ingeniería en Construcción
  • Licenciatura en Ingeniería en Construcción
  • Ver ítem
  •   Página Principal
  • Trabajos de Graduación
  • Biblioteca José Figueres Ferrer
  • Escuela de Ingeniería en Construcción
  • Licenciatura en Ingeniería en Construcción
  • Ver ítem
JavaScript is disabled for your browser. Some features of this site may not work without it.

Listar

Todo el RepositorioComunidades & ColeccionesPor fecha de publicaciónAutoresTítulosPalabras clavesTipo de Recurso EducativoDestinatarioEsta colecciónPor fecha de publicaciónAutoresTítulosPalabras clavesTipo de Recurso EducativoDestinatario

Mi cuenta

AccederRegistro

Estadísticas

Ver Estadísticas de uso

Ejecución de la construcción del reforzamiento del edificio del centro comercial Plaza Wong

Thumbnail
Ver/
ejecucion_construccion_reforzamiento_edificio_centro.pdf (1.861Mb)
Fecha
2016
Autor
Rodríguez-Blanco, Ulises Pedro
Metadatos
Mostrar el registro completo del ítem
Resumen
This final graduation project entitled "Implementation of the construction of the reinforcement of the building of the Plaza Wong shopping center" is an informative document about the construction process necessary to carry out the reinforcement, both columns and foundations, of a work not only unfinished But defective. The objective of this professional practice is the coordination, execution and supervision of the reinforcement of the building. From the review of the initial state of the construction it is clear that four global activities are required: excavation of columns, foundation, and reinforcement of columns and elaboration of subfloor. This required a daily field inspection, as well as gathering information on the materials and equipment of each task. Control of the cost and duration of the activities was carried out, as well as to identify the risks and how to mitigate them. All in order that the final implementation result fully complies with the new structural design, which does comply with the requirements of the Costa Rican seismic code and soil conditions As a result, a detailed description of the building reinforcement process is shown. The reinforcement lasted 115 days and a total cost of 80.027.488 colones, including materials, machinery and labor. The resulting cost is not the least possible. In addition to several drawbacks during the activities, other factors such as a late soil study affect the final cost. It is for this reason that the documentation of the contingencies and their solutions are of great help to future constructions that require a process similar to the one described in this document.
Descripción
Proyecto de Graduación (Licenciatura en Ingeniería en Construcción) Instituto Tecnológico de Costa Rica, Escuela de Ingeniería en Construcción, 2016.
URI
https://hdl.handle.net/2238/7065
Compartir
       
Métricas
Colecciones
  • Licenciatura en Ingeniería en Construcción [551]

|Contáctenos

Repositorio Institucional del Tecnológico de Costa Rica

Sistema de Bibliotecas del TEC | SIBITEC

© DERECHOS RESERVADOS. Un sitio soportado por DSpace(v. 6.3)

RT-1

 

 


|Contáctenos

Repositorio Institucional del Tecnológico de Costa Rica

Sistema de Bibliotecas del TEC | SIBITEC

© DERECHOS RESERVADOS. Un sitio soportado por DSpace(v. 6.3)

RT-1