Tecnológico de Costa Rica
  • ¿Cómo publicar en el Repositorio TEC?
  • Políticas
  • Recursos Educativos
  • Contáctenos
    • español
    • English
  • español 
    • español
    • English
  • Login
Ver ítem 
  •   Página Principal
  • Trabajos de Graduación
  • Biblioteca José Figueres Ferrer
  • Escuela de Ingeniería en Construcción
  • Licenciatura en Ingeniería en Construcción
  • Ver ítem
  •   Página Principal
  • Trabajos de Graduación
  • Biblioteca José Figueres Ferrer
  • Escuela de Ingeniería en Construcción
  • Licenciatura en Ingeniería en Construcción
  • Ver ítem
JavaScript is disabled for your browser. Some features of this site may not work without it.

Listar

Todo el RepositorioComunidades & ColeccionesPor fecha de publicaciónAutoresTítulosPalabras clavesTipo de Recurso EducativoDestinatarioEsta colecciónPor fecha de publicaciónAutoresTítulosPalabras clavesTipo de Recurso EducativoDestinatario

Mi cuenta

AccederRegistro

Estadísticas

Ver Estadísticas de uso

Monitoreo y control de la aplicación del procedimiento 8P02 Proyectos y adecuación de espacios del sistema de Gestión de Calidad de Los Arallanes S.A, según la norma ISO 9001 – 2015, en los procesos constructivos.

Thumbnail
Ver/
monitoreo_control_aplicacion_procedimiento_proyectos_adecuacion_espacios_sistema_gestion_calidad_arallanes.pdf (1.336Mb)
Fecha
2018
Autor
Ferreto-Alfaro, Karolina
Metadatos
Mostrar el registro completo del ítem
Resumen
Quality management and the implementation of project management in construction companies are key for success, since it proves that the industry can generate products and / or services that meet customer requirements. However, it is necessary to build culture of quality in the organization, including all the coworkers and the management team. This project must be kept under constant study and updating. Therefore, the objective of this paper, consists in the process of control & monitoring of the application of the 8P02 Projects and Adequacy of Spaces Procedure and PMBOK Guide, which belongs to the integrated quality management system of Los Arallanes S.A. Due the necessity of the engineering department, to evaluate its efficiency and the conformity of the processes regarding the procedure. The ISO 9001: 2015 standard was studied, the 8P02 Project and adaptation of spaces and the PMBOK Guide, the data of the assigned construction projects was analyzed, those projects were followed up and informal interviews were carried out with key personnel. . A total of 91 non-compliances regarding forms was identified, the absence of a record of non-compliant departures and non-conformities, concluding that the procedure required modifications, which were created and a proposal for the new procedure was presented.
Descripción
Proyecto de Graduación (Licenciatura en Ingeniería en Construcción) Instituto Tecnológico de Costa Rica, Escuela de Ingeniería en Construcción, 2018.
URI
https://hdl.handle.net/2238/10051
Compartir
       
Métricas
Colecciones
  • Licenciatura en Ingeniería en Construcción [551]

|Contáctenos

Repositorio Institucional del Tecnológico de Costa Rica

Sistema de Bibliotecas del TEC | SIBITEC

© DERECHOS RESERVADOS. Un sitio soportado por DSpace(v. 6.3)

RT-1

 

 


|Contáctenos

Repositorio Institucional del Tecnológico de Costa Rica

Sistema de Bibliotecas del TEC | SIBITEC

© DERECHOS RESERVADOS. Un sitio soportado por DSpace(v. 6.3)

RT-1