Tecnológico de Costa Rica
  • How to publish in Repositorio TEC?
  • Policies
  • Educational Resources
  • Contact us
    • español
    • English
  • English 
    • español
    • English
  • Login
View Item 
  •   Repository Home
  • Trabajos de Graduación
  • Biblioteca José Figueres Ferrer
  • Escuela de Ingeniería Electromecánica
  • Licenciatura en Mantenimiento Industrial
  • View Item
  •   Repository Home
  • Trabajos de Graduación
  • Biblioteca José Figueres Ferrer
  • Escuela de Ingeniería Electromecánica
  • Licenciatura en Mantenimiento Industrial
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Browse

All RepositoryCommunities & CollectionsBy Issue DateAuthorsTitlesKeywordEducational Resource TypeIntended UserThis CollectionBy Issue DateAuthorsTitlesKeywordEducational Resource TypeIntended User

My Account

LoginRegister

Statistics

View Usage Statistics

Rediseño de la instalación eléctrica de la planta de Envases Comeca S. A.

Thumbnail
View/Open
rediseño_instalacion_electrica_planta_evanses_comeca.pdf (7.752Mb)
Date
2018
Author
Elizondo-Picado, Kevin
Metadata
Show full item record
Abstract
Like the first article of the National Electrical Code, the purpose of this project is to safeguard people and property against the risks arising from the use of electricity. These are aspects of security that most influence the development of this project, however, as engineers should seek a balance between the appropriate application of the regulation, without neglecting economic, logistical, and practical aspects. Now, the Envases Comeca S. A. plant is supplied with electric power through the distribution lines of the Compañía Nacional de Fuerza y Luz (CNFL) at a voltage of 13,8/7,62 kV with a demand of 1,5 MW. However, from August 2018 the energy will be delivered at a voltage of 34,5/19,9 kV. This change in the plant conditions not only forces a change in the rush equipment, but also opens an opportunity for the redesign and improvement of the electrical installation. A diagnosis is made of the rush and the main equipment that will be directly affected by the change, based on measurements taken in the field, ensuring that it complies with the minimum requirements established by the NEC 2008, and planning modifications if not. Engineering studies are carried out as the short-circuit study, the correct connections are determined for a good grounding system, a database is designed to optimize the information management and economic details are presented, always relevant to the realization of any project.
Description
Proyecto de Graduación (Licenciatura en Mantenimiento Industrial) Instituto Tecnológico de Costa Rica, Escuela de Ingeniería Electromecánica, 2018.
URI
https://hdl.handle.net/2238/10083
Share
       
Metrics
Collections
  • Licenciatura en Mantenimiento Industrial [286]

|Contact us

Repositorio Institucional del Tecnológico de Costa Rica

Sistema de Bibliotecas del TEC | SIBITEC

© DERECHOS RESERVADOS. Un sitio soportado por DSpace(v. 6.3)

RT-1

 

 


|Contact us

Repositorio Institucional del Tecnológico de Costa Rica

Sistema de Bibliotecas del TEC | SIBITEC

© DERECHOS RESERVADOS. Un sitio soportado por DSpace(v. 6.3)

RT-1