Tecnológico de Costa Rica
  • ¿Cómo publicar en el Repositorio TEC?
  • Políticas
  • Recursos Educativos
  • Contáctenos
    • español
    • English
  • español 
    • español
    • English
  • Login
Ver ítem 
  •   Página Principal
  • Trabajos de Graduación
  • Biblioteca José Figueres Ferrer
  • Escuela de Ingeniería Electromecánica
  • Licenciatura en Mantenimiento Industrial
  • Ver ítem
  •   Página Principal
  • Trabajos de Graduación
  • Biblioteca José Figueres Ferrer
  • Escuela de Ingeniería Electromecánica
  • Licenciatura en Mantenimiento Industrial
  • Ver ítem
JavaScript is disabled for your browser. Some features of this site may not work without it.

Listar

Todo el RepositorioComunidades & ColeccionesPor fecha de publicaciónAutoresTítulosPalabras clavesTipo de Recurso EducativoDestinatarioEsta colecciónPor fecha de publicaciónAutoresTítulosPalabras clavesTipo de Recurso EducativoDestinatario

Mi cuenta

AccederRegistro

Estadísticas

Ver Estadísticas de uso

Diseño del modelo de gestión de mantenimiento de las plantas hidroeléctricas de GPG Costa Rica

Thumbnail
Ver/
diseno_modelo_gestion_mantenimiento_plantas_hidroelectricas_gpg_costa_rica.pdf (5.982Mb)
Fecha
2018
Autor
Campos-Esquivel, Kevin Mauricio
Metadatos
Mostrar el registro completo del ítem
Resumen
lectric power generation is an area of constant growth, which not only benefits consumers, but also generates sources of employment and profits for domestic and foreign investors. Global Power Generation, a subsidiary of the Spanish company Gas Natural Fenosa, is a part of the Costa Rican energy production force. Through the management of two hydroelectric generation plants: Torito and La Joya, Global Power Generation adds a potential of 100 MW to the national electricity system. Operación y Mantenimiento Energy Costa Rica, also a subsidiary of the Spanish parent company, is in charge of the production and maintenance operations of the GPG Group. It is through O&M Energy’s work of the maintenance procedures that the need for improving the Maintenance Department was decided. This measure intends to ensure the optimal operation of the generators. The MES maintenance audit was applied to determine the degree of maturity of the Maintenance Department, that was taken as a starting point to analyze the initial situation. The result is a maintenance plan that is comprehensive, active, and in constant improvement. This guarantees the company will make the most of its available technological and human resources. As part of the implementations, a 5S program is implemented in General Warehouse area with the purpose of incorporating the Warehouse of spare parts storage together as a participative entity within the management plan. In addition, by developing Pareto analysis and developing the critical matrix within the maintenance objects of the company, the implementation of five initial stages of the management plan are achieved. This establishes the base for the continuity of the model and allows further improvement of the maintenance plans applied within the Global Power Generation's plants.
Descripción
Proyecto de Graduación (Licenciatura en Mantenimiento Industrial) Instituto Tecnológico de Costa Rica, Escuela de Ingeniería Electromecánica, 2018.
URI
https://hdl.handle.net/2238/10433
Compartir
       
Métricas
Colecciones
  • Licenciatura en Mantenimiento Industrial [286]

|Contáctenos

Repositorio Institucional del Tecnológico de Costa Rica

Sistema de Bibliotecas del TEC | SIBITEC

© DERECHOS RESERVADOS. Un sitio soportado por DSpace(v. 6.3)

RT-1

 

 


|Contáctenos

Repositorio Institucional del Tecnológico de Costa Rica

Sistema de Bibliotecas del TEC | SIBITEC

© DERECHOS RESERVADOS. Un sitio soportado por DSpace(v. 6.3)

RT-1