Estimación de Costos para la Construcción de un Gimnasio Multiuso por Etapas.
(Instituto Tecnológico de Costa Rica, 2007)
This project involves the development of detailed cost estimates and inspection of economic gyms type. Through it, seek to create a database containing materials list, activities, and total unit costs, which allows to ...
Desarrollo de una Aplicación y Procedimiento para Control de Costos de los Proyectos Constructivos de KIREBE
(Instituto Tecnológico de Costa Rica, 2008)
KIREBE´s company was presenting problems for the deficient managing of control of costs that was carried out in its constructive projects; that’s because, the practice directed was realized here, and look for deficiencies ...
Elaboración y desarrollo del plan de proyecto para el Banco Nacional en Pozos de Santa Ana
(Instituto Tecnológico de Costa Rica, 2008)
This graduation project comprise a project plan to satisfy client’s need, a building construction, accomplishing the requisites of range, time, cost, quality, human resource, purchases, and contracts, security, communication, ...
Elaboración y desarrollo del plan de proyecto para el Banco Nacional en Pozos de Santa Ana
(Instituto Tecnológico de Costa Rica, 2008)
Este proyecto de graduación contiene un plan de proyecto, para satisfacer la necesidad del cliente; la construcción de un edificio, cumpliendo los requisitos de alcance, tiempo, costo, calidad, recurso humano, compras y ...
Rendimientos de la mano de obra por horas-hombre en el área de construcción de viviendas para la empresa constructora MAVACON
(Instituto Tecnológico de Costa Rica, 2007)
The following project measures labor work performance in house building for MAVACON Construction Company.
The main objective is to obtain the performance of labor work per worker in an hour time, to apply as a tool in ...
Protocolo de Procedimientos para la Construcción de Obras Civiles en la Cooperativa de Productores de Leche Dos Pinos R.L
(Instituto Tecnológico de Costa Rica, 2007)
The Developer project corresponds to a construction procedure of the civil works for Dos Pinos. The object of the project is to elaborate a procedure that allows identifying the different stages of the construction process, ...
Revisión y mejora del Sistema de Contratación Administrativa del Departamento de Obras por Contrato del Ministerio de Obras Públicas y Transportes de Costa Rica
(Instituto Tecnológico de Costa Rica, 2006)
Public bid constitutes the ideal and imperative mean in which public institutions, non-governmental entities, public companies, private enterprises and individuals, that use total or partial public funds, obtain goods and ...
Diseño e implementación de un Sistema de Control de Costos
(Instituto Tecnológico de Costa Rica, 2007)
The object of this project was to develop a system to keep control of the expenses made by the company in each project.
In order to achieve these objective several sheets of Microsoft Excel were programmed.
As a result, ...
Diseño de un modelo de cálculo para el control de la mano de obra.
(Instituto Tecnológico de Costa Rica. Escuela de Ingeniería Construcción., 2002)
El trabajo que se presenta a continuación propone un análisis que pretende sustancialmente formular un esquema de control de la mano de obra en proyectos constructivos por medio de una hoja electrónica que relaciona los ...
Proyecto de construcción de un muro de gaviones de 960 m3
(Instituto Tecnológico de Costa Rica, 2008)
El presente documento es un compendio de información relevante sobre el tema de muros de gaviones, sus principales aplicaciones, métodos de diseño, ventajas sobre otras alternativas de contención, así como otras aplicaciones ...