Metodología para la administración de los materiales de la Constructora Adelante Desarrollos S.A.
(Instituto Tecnológico de Costa Rica, 2017)
The following report presents a proposal of improvement to the administration and use of the materials in the construction Company Adelante Desarrollos S.A. We choose three types of housing as an object of study, which ...
Factores que afectan la construcción de alcantarillado sanitario para la Constructora Fernández Vaglio S.A.
(Instituto Tecnológico de Costa Rica, 2018)
The work presented below is based on the determination of factors that affect the construction of a sanitary pipeline project, to propose tools and methods to be able to reduce the elements identified to the maximum. To ...
Análisis y revisión de costos de renglones de pago en obras contratadas por el CONAVI.
(Instituto Tecnológico de Costa Rica, 2010)
Este proyecto consiste en un estudio de la estructura del sistema de costos empleado en el CONAVI para calcular los precios en las actividades carreteras, los cuales se realizan por contrato.
La finalidad del presente ...
Análisis de la productividad y rendimiento de la mano de obra para algunas actividades constructivas del sistema electromecánico en Torres de Parqueo UCR
(Instituto Tecnológico de Costa Rica, 2017)
The objective in the development of this
graduation project is to establish the performance
and productivities of the labor in constructive
activities of the electromechanical part in charge
of the company CMC contratista ...
Análisis descriptivo de la construcción de las obras de protección en las márgenes del Río Parrita
(Instituto Tecnológico de Costa Rica, 2010)
In the last years, the canton of Parrita had been affected by the overflowing of the Parrita River. This has been cause by diverse climatic factors like tropical storms, hurricanes or extended raining periods. These natural ...
Plan de Gestión de Calidad en el Proyecto Aporte la Flor del Proyecto Hidroeléctrico Toro 3 utilizando la guía PMI
(Instituto Tecnológico de Costa Rica, 2012)
The present paper was performed under the Directed Professional Practice mode to opt for a Degree in Construction Engineering.
The project was developed in Proyecto Toro 3 ICE, in the construction of the Aporte La Flor, ...
Mejora del sistema de presupuestos y control de costos de la empresa ESMERA S.A.
(Instituto Tecnológico de Costa Rica, 2016)
In this report is presented a proposal to
improve the budget system and cost control of the
company ESMERA SA, as a result of graduation
project in the modality of directed professional
practice.
This improvement ...
Mejoramiento de tres procesos constructivos en el Condominio Anderes
(Instituto Tecnológico de Costa Rica, 2014)
This project details the application of measurement techniques to improve productivity construction processes. The applied techniques were carried out during the block paste, ceramic paste and plastering of walls, corresponding ...
Diagnóstico de procedimientos de inspección estructural y propuesta de herramientas de estandarización.
(Instituto Tecnológico de Costa Rica, 2014)
The structural inspection is a procedure that must
be present during the construction of all civil works
and is one of the most important to ensure the
structural quality of the construction activities.
This project ...
Dimensionamiento de la estructura de pavimento en la Calle 1 de San Isidro, Pérez Zeledón, utilizando la metodología mecanística empírica para diseño de pavimentos y creación de un plan de conservación
(Instituto Tecnológico de Costa Rica, 2018)
To determine the structure of the pavement to be used in "Calle 1" of San Isidro, Pérez Zeledón the design of three types of flexible, semi-rigid, rigid pavements is proposed. These are designed by the mechanistic-empirical ...