Tecnológico de Costa Rica
  • ¿Cómo publicar en el Repositorio TEC?
  • Políticas
  • Recursos Educativos
  • Contáctenos
    • español
    • English
  • español 
    • español
    • English
  • Login
Ver ítem 
  •   Página Principal
  • Trabajos de Graduación
  • Biblioteca José Figueres Ferrer
  • Escuela de Ingeniería en Construcción
  • Licenciatura en Ingeniería en Construcción
  • Ver ítem
  •   Página Principal
  • Trabajos de Graduación
  • Biblioteca José Figueres Ferrer
  • Escuela de Ingeniería en Construcción
  • Licenciatura en Ingeniería en Construcción
  • Ver ítem
JavaScript is disabled for your browser. Some features of this site may not work without it.

Listar

Todo el RepositorioComunidades & ColeccionesPor fecha de publicaciónAutoresTítulosPalabras clavesTipo de Recurso EducativoDestinatarioEsta colecciónPor fecha de publicaciónAutoresTítulosPalabras clavesTipo de Recurso EducativoDestinatario

Mi cuenta

AccederRegistro

Estadísticas

Ver Estadísticas de uso

Análisis de la productividad y rendimiento de la mano de obra para algunas actividades constructivas del sistema electromecánico en Torres de Parqueo UCR

Thumbnail
Ver/
analisis_productividad_rendimiento_mano_obra.pdf (2.842Mb)
Fecha
2017
Autor
Rojas-Zúñiga, Beatriz
Metadatos
Mostrar el registro completo del ítem
Resumen
The objective in the development of this graduation project is to establish the performance and productivities of the labor in constructive activities of the electromechanical part in charge of the company CMC contratista electromecánica, in the Torres de Parqueo project, located at the headquarters Of the University of Costa Rica. In order to determine the productivity and performance, data collection instruments were designed and measurements were taken by means of the implementation of engineering and probabilistic methods such as labor sampling and equipment balance, which allowed to obtain the percentages of productive work, contributory and unproductive of the workers as well as the time allocated to each activity. The work force performance were analyzed for the canalization and wiring of the receptacle systems and the lighting, and for the placement of the fire suppression system. A database has been developed for the company to store and update the performance of the workforce in future projects. A brief survey was applied that, together with the daily observation of the processes, the results that the samples offered allowed to identify the main factors that negatively intervene in the development and the performance of the workers in the different activities.
Descripción
Proyecto de Graduación (Licenciatura en Ingeniería en Construcción) Instituto Tecnológico de Costa Rica, Escuela de Ingeniería en Construcción, 2017.
URI
https://hdl.handle.net/2238/9859
Compartir
       
Métricas
Colecciones
  • Licenciatura en Ingeniería en Construcción [551]

|Contáctenos

Repositorio Institucional del Tecnológico de Costa Rica

Sistema de Bibliotecas del TEC | SIBITEC

© DERECHOS RESERVADOS. Un sitio soportado por DSpace(v. 6.3)

RT-1

 

 


|Contáctenos

Repositorio Institucional del Tecnológico de Costa Rica

Sistema de Bibliotecas del TEC | SIBITEC

© DERECHOS RESERVADOS. Un sitio soportado por DSpace(v. 6.3)

RT-1