Diseño de puente desplazable para la presa sobre el río Cariblanco del Centro de Generación Toro
(Instituto Tecnológico de Costa Rica, 2014)
The project consists of the structural design of a
movable steel truss bridge that will be built over a
small dam in the water intake of the Cariblanco
River, located in Sarapiquí, Alajuela. This is part
of the Cariblanco ...
Plan de Gestión de Recursos Humanos, Comunicaciones y Adquisiciones para Condominios Marisol según la Guía del PMI
(Instituto Tecnológico de Costa Rica, 2014)
The right management of the projects is the success key of a company, the literature divided this administration on nine big areas each one of them on the different company issues. The work will take part on the human ...
Estudio exploratorio en diseños de mezclas de concreto liviano para Holcim (Costa Rica) S.A
(Instituto Tecnológico de Costa Rica, 2014)
This report presents the results obtained from a research carried out in order to develop lightweight concrete mix designs.
During the research, aggregates coming from the Guacalillo Quarry were used, also, tests were ...
Propuesta de mejoramiento de los procesos para la construcción de losas postensadas.
(Instituto Tecnológico de Costa Rica, 2014)
The following report is the development of a proposal for improving the processes related with post-tensioning slabs, from VIVE Sabanilla Project, second phase, by company BILCO Costa Rica S.A.
The specific objectives ...
Programación de pila 3 y estimación de duraciones para la fabricación del acero estructural en la rehabilitación del Puente sobre el río, Virilla Ruta Nacional 1
(Instituto Tecnológico de Costa Rica, 2014)
Este informe presenta una comparación de tres programaciones de pila 3. A su vez, una memoria de cálculo que permite obtener las duraciones para la fabricación de los elementos requeridos en el reforzamiento del acero ...
Propuesta de mejoramiento de los procesos constructivos en el proyecto de Condominios Anderes
(Instituto Tecnológico de Costa Rica, 2014)
This project details the application of
measurement techniques to improve productivity
construction processes. The applied techniques
were carried out during the block paste, ceramic
paste and plastering of walls, ...
Diseño de Procedimientos Técnicos del Laboratorio de Ensayos en Materiales del CONAVI, según los Requisitos de la Norma INTE-ISO/IEC 17025:2005
(Instituto Tecnológico de Costa Rica, 2014)
This document was developed in order to design
all technical procedures for eight laboratory tests
involving hydraulic concrete and twelve tests
related to stone aggregate, within the CONAVI
Material Testing Laboratory, ...
Diagnóstico del sistema de alcantarillado pluvial del tramo de ruta nacional 228 en Cartago
(Instituto Tecnológico de Costa Rica, 2014)
The next project is to pose a diagnostic storm sewer. Areas of study covered correspond to the topography, hydrology and hydraulics. It was necessary, the use of computer programs, information gathering field literature ...
Diseño de un proyecto urbanístico en condominio residencial horizontal en el Cantón de Grecia para la empresa Asesorías Geotec S.A.
(Instituto Tecnológico de Costa Rica, 2014)
The practice is focused on the design of engineering Horizontal Residential Condominium Hacienda Puente de Piedra, located in Grecia. Which has 40 subsidiaries farms, gardens, security, and a wide area of protection intended ...
Desarrollo de una herramienta de planificación del tiempo y aseguramiento de la calidad para la construcción de un edificio habitacional, en la Empresa Constructora Edificar S.A.
(Instituto Tecnológico de Costa Rica, 2014)
This practice was developed in Torres de Flared, which consists of a residential building nine levels, each consisting of four apartments. The scope of the construction company contemplates gray work, electromechanical, ...