Buscar
Mostrando ítems 1-9 de 9
Implementación de la filosofía Lean en la producción de concreto con autohormigonera
(Instituto Tecnológico de Costa Rica, 2017)
The following investigation seeks the Lean
philosophy implementation on the concrete
production process with a self-propelled mixer,
developing a methodology that involves Lean
tools.
At the beginning, the necessary ...
Metodología para la administración de los materiales de la Constructora Adelante Desarrollos S.A.
(Instituto Tecnológico de Costa Rica, 2017)
The following report presents a proposal of improvement to the administration and use of the materials in the construction Company Adelante Desarrollos S.A. We choose three types of housing as an object of study, which ...
Guía de gestión de la calidad para los proyectos constructivos de la empresa Navarro y Avilés S.A.
(Instituto Tecnológico de Costa Rica, 2017)
In this paper the project to opt for the Construction
Engineering Licenciature grade at Instituto
Tecnológico de Costa Rica is presented, under the
modality of directed professional practice, carried
out in Navarro y ...
Implementación del software O4B en la gestión de control de proyectos en la Unidad Técnica de Gestión Vial de la Municipalidad de Osa
(Instituto Tecnológico de Costa Rica, 2017)
The implementation project of the Open for Business software "O4B" in the Municipality of Osa consists of applying this program in the control of road projects, using information from the projects that were being executed, ...
Implementación de la metodología de planificación y control “Last Planner” en el proyecto de construcción: Unidad Productiva San Rafael
(Instituto Tecnológico de Costa Rica, 2017)
The main purpose of this project is to implement a planning and control system to improve the fulfillment of the activities that constitute a construction project for a period of 10 weeks. The Last Planner System (LPS) ...
Plan para la mejora en la gestión de los procesos de programación, elaboración de presupuesto, control y calidad de obra en la Empresa D’QS S.A.S. de Medellín, Colombia
(Instituto Tecnológico de Costa Rica, 2017)
The developed work consists in the intervention of four constructive process from the company D’QS S.A.S. in Medellín, Colombia. The objective is to develop an integral plan for improve the management of the processes of ...
Aplicación de Lean Construction a través de la metodología Last Planner a proyectos de vivienda social de FUPROVI
(Instituto Tecnológico de Costa Rica, 2017)
The present paper consists on the final report of the graduation project, which consisted on designing the procedure for the application of Last Planner System® (LPS) and perform a pilot application on a project under ...
Aplicaciones de aeronaves no tripuladas en el control de avance de obras civiles.
(Instituto Tecnológico de Costa Rica, 2017)
The purpose of this research is to create a
methodology that facilitates and speed up the
collection of data in order to quantifiably determine
the progress of construction work, through the use
of drones and commercial ...
Control de costos en edificio de tres niveles
(Instituto Tecnológico de Costa Rica, 2017)
The purpose of this study is to improve and strengthen the cost control system of Grupo Condeco Vac S.A. The development starts with an analysis of the actual situation of the company this was generated with a compilation ...