Buscar
Mostrando ítems 11-20 de 33
Diseño e implementación de un Sistema de Control de Costos
(Instituto Tecnológico de Costa Rica, 2007)
The object of this project was to develop a system to keep control of the expenses made by the company in each project.
In order to achieve these objective several sheets of Microsoft Excel were programmed.
As a result, ...
Estimación de Costos para la Construcción de un Gimnasio Multiuso por Etapas.
(Instituto Tecnológico de Costa Rica, 2007)
This project involves the development of detailed cost estimates and inspection of economic gyms type. Through it, seek to create a database containing materials list, activities, and total unit costs, which allows to ...
Actualización del sistema de revisión de precios del mercado enfocado a remodelaciones de obras del Banco Nacional
(Instituto Tecnológico de Costa Rica, 2016)
In collaboration with the Price revision system of
The National Bank, a study of construction market
as well as the adjustment of its budgeting tool in
order to improve its administrative contractive
processes.
To ...
Implementación de una metodología para la integración y gestión de información entre los departamentos de modelado y proyectos en la empresa Construcciones Peñaranda S.A
(Instituto Tecnológico de Costa Rica, 2024-03-06)
El presente proyecto tiene como objetivo implementar una metodología que mediante la herramienta
Revit ayude a fortalecer el departamento tanto de modelado como el departamento de proyectos en la
empresa Construcciones ...
Estrategias de intervención para el problema de deformación superficial presente en la Ruta Nacional 2, sección de control 60012, estación 605+650 y la sección de control 60001, estación 350+080
(Instituto Tecnológico de Costa Rica, 2021-08)
Este proyecto consiste en la elaboración de diferentes estrategias de intervención para brindar solución al principal problema de deformación superficial, así como a las diferentes patologías que atentan contra la seguridad ...
Desarrollo de una Aplicación y Procedimiento para Control de Costos de los Proyectos Constructivos de KIREBE
(Instituto Tecnológico de Costa Rica, 2008)
KIREBE´s company was presenting problems for the deficient managing of control of costs that was carried out in its constructive projects; that’s because, the practice directed was realized here, and look for deficiencies ...
Revisión y mejora del Sistema de Contratación Administrativa del Departamento de Obras por Contrato del Ministerio de Obras Públicas y Transportes de Costa Rica
(Instituto Tecnológico de Costa Rica, 2006)
Public bid constitutes the ideal and imperative mean in which public institutions, non-governmental entities, public companies, private enterprises and individuals, that use total or partial public funds, obtain goods and ...
Elaboración y desarrollo del plan de proyecto para el Banco Nacional en Pozos de Santa Ana
(Instituto Tecnológico de Costa Rica, 2008)
This graduation project comprise a project plan to satisfy client’s need, a building construction, accomplishing the requisites of range, time, cost, quality, human resource, purchases, and contracts, security, communication, ...
Implementación de la metodología Last Planner System en los procesos constructivos de la empresa SCH Consultoría y Construcción Tica S.A
(Instituto Tecnológico de Costa Rica, 2024-03-12)
El proyecto se concentra en implementar la filosofía Last Planner System (LPS) en SCH Consultoría y Construcción Tica S.A. Esta implementación tiene como propósito principal mejorar la eficiencia operativa, reducir costos ...
Diseño básico y costos del proyecto hidroeléctrico Peje
(Instituto Tecnológico de Costa Rica, 2010)
Se presenta en este documento los
procedimientos y herramientas utilizados para
realizar un diseño básico y análisis de costos del
proyecto hidroeléctrico Peje para la empresa
Edificadora Beta.
El objetivo de este ...