Plan de Gestión de Riesgos Proyecto Hidroeléctrico Capulín-San Pablo
(Instituto Tecnológico de Costa Rica, 2015)
This document corresponds to the development of a risk management plan for the Hydroelectric Project Capulín - San Pablo. Through which the current situation of the company in risk management was analyzed in order to ...
Mejoramiento de los procesos de mantenimiento y control de calidad en la infraestructura de los recintos portuarios del Incop, particularmente Caldera
(Instituto Tecnológico de Costa Rica, 2015)
The present project proposes an alternative to improve and facilitate the inspection works done at Instituto Costarricense de Puertos del Pacífico (Costa Rican Institute of Pacific Ocean Ports). This will be achieved through ...