Buscar
Mostrando ítems 1-4 de 4
Inspección y seguimiento del proyecto Sede de área de Salud de Barva de Heredia desarrollado por la Caja Costarricense de Seguro Social.
(Instituto Tecnológico de Costa Rica, 2016)
This report of the professional practice shows a
proposal of an improvement in the inspection
process in the area of Direction of Architecture
and Engineering (DAI) of Caja Costarricense de
Seguro Social in their ...
Factores que afectan la construcción de alcantarillado sanitario para la Constructora Fernández Vaglio S.A.
(Instituto Tecnológico de Costa Rica, 2018)
The work presented below is based on the determination of factors that affect the construction of a sanitary pipeline project, to propose tools and methods to be able to reduce the elements identified to the maximum. To ...
Ejecución de la construcción del reforzamiento del edificio del centro comercial Plaza Wong
(Instituto Tecnológico de Costa Rica, 2016)
This final graduation project entitled
"Implementation of the construction of the
reinforcement of the building of the Plaza Wong
shopping center" is an informative document
about the construction process necessary to ...
Herramienta para la Gestión de Proyecto desde la Perspectiva de la Oficina de Ingeniería
(Instituto Tecnológico de Costa Rica, 2016)
According to the problems identified in the Office
of Engineering Technology of Costa Rica, in the
work of project control, it took place this
Professional Practice in order to identify
weaknesses facing and propose a ...