Diagnóstico de la calidad de la energía y evaluación de las instalaciones eléctricas en la Represa Hidroeléctrica Pirrís
(Instituto Tecnológico de Costa Rica, 2017)
In the installations of the dam site, of the Hydroelectrical Power Plant Pirrís, the occurrence of events and equipment fails, as control and monitoring systems errors, speed drives and transformer fails, that can be related ...
Estudio de calidad de energía eléctrica en la instalación de Laboratorios Stein, Costa Rica
(Instituto Tecnológico de Costa Rica, 2018)
Due to previous indications of events related to the power quality supplied by the distribution company to Laboratorios Stein, it is decided to make a representative power quality study of the whole existing electrical ...
Análisis técnico para la construcción de una planta de generación solar para JASEC
(Instituto Tecnológico de Costa Rica, 2018)
In this work, a feasibility study is developed that focuses on the design of a photo-voltaic solar power plant, using mono-crystalline panels with bifacial technology, in an empty area of the JASEC company. The project ...
Rediseño de la instalación eléctrica de la oficina del Banco de Costa Rica del Barrio el Carmen, San José
(Instituto Tecnológico de Costa Rica, 2016)
The branch of the Bank of Costa Rica located in the Carmen district, San Jose, has an
obsolete electrical installation that does not meet the regulations of the National
Electrical Code.
Among the anomalies found no ...