Buscar
Mostrando ítems 21-22 de 22
Diseño e implementación de un programa de cinco eses en la fábrica de tubos del Proyecto Hidroeléctrico Reventazón
(Instituto Tecnológico de Costa Rica, 2014)
For this assignment, 5 S program was designed for implementation in the High Pressure Tube Factory of the Reventazón River Hydroelectric Project. However, due to the time limit applied to this assignment, only the first ...
Evaluación del sistema hidráulico de agua potable de Alimentos Prosalud
(Instituto Tecnológico de Costa Rica, 2014)
With the passage of time Alimentos Prosalud has made variations in their production processes, new equipment has been installed and there have been movements at the location of the existing equipment. The installation and ...