Mostrar el registro sencillo del ítem
Estudio para el ajuste del transformador de la subestación Chilamate, ante la falla de la salida de la línea 6904 de Coopelesca R.L.
dc.contributor.advisor | Valle-Granados, Ignacio del | es |
dc.contributor.author | Valverde-Retana, Marta Elizabeth | |
dc.date.accessioned | 2021-07-19T20:36:38Z | |
dc.date.available | 2021-07-19T20:36:38Z | |
dc.date.issued | 2021 | |
dc.identifier.uri | https://hdl.handle.net/2238/13221 | |
dc.description | Proyecto de Graduación (Licenciatura en Mantenimiento Industrial) Instituto Tecnológico de Costa Rica, Escuela de Ingeniería Electromecánica, 2021 | es |
dc.description | Esta tesis cumple con el Objetivo ODS 7: de la Agenda 2030 "GARANTIZAR EL ACCESO A UNA ENERGÍA ASEQUIBLE, FIABLE, SOSTENIBLE Y MODERNA PARA TODAS LAS PERSONAS" con la meta número 1: "Garantizar el acceso universal a servicios energéticos asequibles, fiables y modernos". | |
dc.description.abstract | El desarrollo de la electricidad a lo largo de los años, ha sido una herramienta revolucionaria para la industria y el desarrollo del mundo, brindando grandes aportes a la cotidianidad de la humanidad. Coopelesaca R.L. siempre ha sido relevante para la población de la zona norte, debido que cuenta con un sistema eficiente y confiable para la distribución de electricidad, logrando brindar un buen servicio a todos sus usuarios. Es importante para la cooperativa, mantener sus índices de mejora continua en el sistema de distribución, por lo que a largo de los años se ha interesado en ser constante en su servicio de calidad. Coopelesca R.L. es una empresa que su 100% de energía es renovable, por consiguiente, su preocupación por disminuir el impacto ambiental es evidente. Actualmente, producen en total 86 MW para la zona norte. El objetivo de este proyecto es realizar un estudio técnico para así evitar la pérdida de 22.4 MW producido por la no generación de la planta hidroeléctrica de Cubujuquí, debido a que la línea de transmisión 6904 pueda presentar una falla que la indisponga, dejando sin conexión una parte de la red, provocando consecuencias negativas en la continuidad de electricidad y dejando pérdidas económicas en alrededor de ₡133 310 151,63. Se realizó un estudio a la red mediante una simulación, implementado el uso del software ETAP 19.5, desarrollando una propuesta de escenarios para la solución del problema y así analizar el comportamiento de la red de acuerdo con las reconfiguraciones, buscando siempre las mejoras para el sistema de distribución en beneficio de sus asociados y la empresa. Se estudio el flujo de potencia y se obtuvieron distintos datos de las cargas, las barras y su generación, para así lograr realizar un análisis de las pérdidas que presenta el sistema y las caídas de tensión, dejando claro el impacto que tiene sobre la confiablidad de la red. Finalmente se realizó un análisis económico para ver la viabilidad de las propuestas realizadas para empresa. | es |
dc.description.abstract | The development of electricity over the years has been a revolutionary tool for industry and the development of the world, providing great contributions to the daily life of humanity. Coopelesca RL has always been relevant for the population of the northern zone, because it has an efficient and reliable system for the distribution of electricity, managing to provide a good service to all its users. The cooperative needs to maintain its continuous improvement rates in the distribution system, so it has been interested in being constant in its quality service over the years. Coopelesca RL is a company whose energy is 100% renewable, therefore its concern to reduce the environmental impact is evident. Currently, they produce a total of 86 MW for the northern zone. The objective of this project is to carry out a technical study to avoid the loss of 22.4 MW produced by the Cubujuquí hydroelectric plant because transmission line 6904 has an output failure leaving a part of the network without connection. causing negative consequences in the continuity of electricity and leaving economic losses around ₡ 133 310 151.63. A study was carried out on the network using a simulation, implementing the use of the ETAP 19.5 software, developing a proposal of scenarios to solve the problem, and thus analyze the behavior of the network according to the reconfigurations, always looking for improvements for the system distribution for the benefit of its associates and the company. The power ow was studied, where different data of the loads, the bars, and their generation were obtained to analyze the losses that the system presents and the voltage drops, making clear the impact they have on stability and network reliability. Finally, an economic analysis was carried out to see the viability of the proposals made for the company. | es |
dc.description.sponsorship | COOPELESCA R.L. | es |
dc.language.iso | spa | es |
dc.publisher | Instituto Tecnológico de Costa Rica | es |
dc.subject | Transformadores | es |
dc.subject | Líneas eléctricas | es |
dc.subject | Planta hidroeléctrica | es |
dc.subject | Cargas | es |
dc.subject | Distribución de electricidad | es |
dc.subject | Mejoramiento continuo | es |
dc.subject | Sistemas de distribución | es |
dc.subject | Transformers | es |
dc.subject | Transmission lines | es |
dc.subject | Hydroelectric plant | es |
dc.subject | Electricity distribution | es |
dc.subject | Continuous improvement | es |
dc.subject | Loads | es |
dc.subject | Distribution systems | es |
dc.subject | Research Subject Categories::TECHNOLOGY::Electrical engineering, electronics and photonics | es |
dc.title | Estudio para el ajuste del transformador de la subestación Chilamate, ante la falla de la salida de la línea 6904 de Coopelesca R.L. | es |
dc.type | tesis de licenciatura | es |