Tecnológico de Costa Rica
  • How to publish in Repositorio TEC?
  • Policies
  • Educational Resources
  • Contact us
    • español
    • English
  • English 
    • español
    • English
  • Login
View Item 
  •   Repository Home
  • Trabajos de Graduación
  • Biblioteca José Figueres Ferrer
  • Escuela de Ingeniería en Construcción
  • Licenciatura en Ingeniería en Construcción
  • View Item
  •   Repository Home
  • Trabajos de Graduación
  • Biblioteca José Figueres Ferrer
  • Escuela de Ingeniería en Construcción
  • Licenciatura en Ingeniería en Construcción
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Browse

All RepositoryCommunities & CollectionsBy Issue DateAuthorsTitlesKeywordEducational Resource TypeIntended UserThis CollectionBy Issue DateAuthorsTitlesKeywordEducational Resource TypeIntended User

My Account

LoginRegister

Statistics

View Usage Statistics

Mejoramiento de tres procesos constructivos en el Condominio Anderes

Thumbnail
View/Open
propuesta_mejoramiento_tres_procesos_constructivos.pdf (8.432Mb)
Date
2014
Author
Anchía-Céspedes, Marcos
Metadata
Show full item record
Abstract
This project details the application of measurement techniques to improve productivity construction processes. The applied techniques were carried out during the block paste, ceramic paste and plastering of walls, corresponding to the construction of a condominium project in confined masonry, with an approximate area of 209 m² each equal housing and architectural facades. The study describes the process, the productivity and measures of labor, then the analysis were obtained to suggest improvement and provides processes and procedures, the researcher first identifies the activities when building a house; then, from all the listed activities some of them where selected with the opinion of an expert in the field of 209 m². The application of this technique produced results as: Identify activities that have productivity problems. To paste activity of block was obtained that productive work is 30%, 46% tax work, 24% non-productive work. The results obtained in ceramic paste productive work was a 21%, 60% Contributory work, 19% non-productive work. In the plaster walls of productive work 30%, 62% tax work and busywork 8% was obtained. It was determined that in the site design and structural design- the architecture has to merge with the construction to avoid problems and loss of productivity. The measurement techniques are appropriate in the construction industry to improve the processes and the productivity.
Description
Proyecto de Graduación (Licenciatura en Ingeniería en Construcción) Instituto Tecnológico de Costa Rica, Escuela de Ingeniería en Construcción, 2014.
URI
https://hdl.handle.net/2238/6079
Share
       
Metrics
Collections
  • Licenciatura en Ingeniería en Construcción [491]

|Contact us

Repositorio Institucional del Tecnológico de Costa Rica

Sistema de Bibliotecas del TEC | SIBITEC

© DERECHOS RESERVADOS. Un sitio soportado por DSpace(v. 6.3)

RT-1

 

 


|Contact us

Repositorio Institucional del Tecnológico de Costa Rica

Sistema de Bibliotecas del TEC | SIBITEC

© DERECHOS RESERVADOS. Un sitio soportado por DSpace(v. 6.3)

RT-1