Tecnológico de Costa Rica
  • ¿Cómo publicar en el Repositorio TEC?
  • Políticas
  • Recursos Educativos
  • Contáctenos
    • español
    • English
  • español 
    • español
    • English
  • Login
Ver ítem 
  •   Página Principal
  • Trabajos de Graduación
  • Biblioteca José Figueres Ferrer
  • Escuela de Ingeniería en Construcción
  • Licenciatura en Ingeniería en Construcción
  • Ver ítem
  •   Página Principal
  • Trabajos de Graduación
  • Biblioteca José Figueres Ferrer
  • Escuela de Ingeniería en Construcción
  • Licenciatura en Ingeniería en Construcción
  • Ver ítem
JavaScript is disabled for your browser. Some features of this site may not work without it.

Listar

Todo el RepositorioComunidades & ColeccionesPor fecha de publicaciónAutoresTítulosPalabras clavesTipo de Recurso EducativoDestinatarioEsta colecciónPor fecha de publicaciónAutoresTítulosPalabras clavesTipo de Recurso EducativoDestinatario

Mi cuenta

AccederRegistro

Estadísticas

Ver Estadísticas de uso

Sistema de control y seguimiento de obras del proyecto “Obras de Post-Cierre del Relleno Sanitario Río Azul

Thumbnail
Ver/
sistemadecontrolyseguimientodeobrasdelproyecto _obrasdepost-cierredelrellenosanitariorioazul.pdf (3.231Mb)
Fecha
2010
Autor
Navarro-Solano, Carlos Andrés
Metadatos
Mostrar el registro completo del ítem
Resumen
The Río Azul Landfill is currently under a post-closure process to mitigate the harmful effects on the environment and the public health. The purpose of this work is to establish a control and monitoring system of the project “Río Azul Landfill’s Post-Closure Works”, focused on the areas of Scope, Time, Quality and Human Resources. This was achieved through the development of management tools for equipment and machinery, considering the number of operation hours, the diesel consumed by the equipment and the cost for the project; this way the effective working hours of the machinery were known in detail, obtaining the real costs associated to the equipment. Regarding the manpower, a ticket system was implemented, providing information of the manpower distribution in the different project activities. As part of this work, a field verification of the works’ quality was conducted to ensure they follow the technical specifications of the project; also an inspection and maintenance sheet for closed landfills was elaborated in order to follow the country’s regulation laws. In conclusion, it’s essential in any project to do works’ inspections both during the construction process and at the end to get the quality work expected. Finally, equipment monthly performance reports were prepared for the Project Management, and work areas were settled for the monthly maintenance activities, in order to cover all the Río Azul’s Landfill area.
Descripción
Proyecto de Graduación (Licenciatura en Ingeniería en Construcción). Instituto Tecnológico de Costa Rica. Escuela de Ingeniería en Construcción, 2010.
URI
https://hdl.handle.net/2238/6086
Compartir
       
Métricas
Colecciones
  • Licenciatura en Ingeniería en Construcción [553]

|Contáctenos

Repositorio Institucional del Tecnológico de Costa Rica

Sistema de Bibliotecas del TEC | SIBITEC

© DERECHOS RESERVADOS. Un sitio soportado por DSpace(v. 6.3)

RT-1

 

 


|Contáctenos

Repositorio Institucional del Tecnológico de Costa Rica

Sistema de Bibliotecas del TEC | SIBITEC

© DERECHOS RESERVADOS. Un sitio soportado por DSpace(v. 6.3)

RT-1