Tecnológico de Costa Rica
  • How to publish in Repositorio TEC?
  • Policies
  • Educational Resources
  • Contact us
    • español
    • English
  • English 
    • español
    • English
  • Login
View Item 
  •   Repository Home
  • Trabajos de Graduación
  • Biblioteca José Figueres Ferrer
  • Escuela de Ingeniería en Construcción
  • Licenciatura en Ingeniería en Construcción
  • View Item
  •   Repository Home
  • Trabajos de Graduación
  • Biblioteca José Figueres Ferrer
  • Escuela de Ingeniería en Construcción
  • Licenciatura en Ingeniería en Construcción
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Browse

All RepositoryCommunities & CollectionsBy Issue DateAuthorsTitlesKeywordEducational Resource TypeIntended UserThis CollectionBy Issue DateAuthorsTitlesKeywordEducational Resource TypeIntended User

My Account

LoginRegister

Statistics

View Usage Statistics

Diseño de Humedal Construido para tratar los lixiviados del Proyecto de Relleno Sanitario de Pococí

Thumbnail
View/Open
diseño_humedal_lixiviados_proyecto_relleno_anitario_Poci.pdf (3.544Mb)
Date
2010
Author
Fonseca-Castro, Manuel
Metadata
Show full item record
Abstract
In order to find an economical solution that functions as conventional water treatment plant, a proposal of an eco-technological treatment that offers an adequate management to the leachates generated by the Los Laureles Landfill in Pococí is presented. To create this design, written and oral sources were consulted to obtain information about the use of this technology, where the use of specific kinds of vegetation, whose roots are in contact with the wastewater, are able to remove polluting components of the water, being the Manual of Technology Assessment for sub surface flow constructed wetlands for wastewater treatment made by the Environmental Protection Agency of the United States, the most consulted source. The measurements of the constructed wetland were made through an Excel 2007 worksheet. Regarding the construction details, hydraulic and soil mechanical principals were applied for a proper performance of the constructed wetland.. Besides, some comparisons with similar wetlands were made, so that the constructed wetland works effectively. Moreover, on the construction plans, it is indicated which materials are needed to make this construction.
Description
Proyecto de Graduación (Licenciatura en Ingeniería en Construcción). Instituto Tecnológico de Costa Rica. Escuela de Ingeniería en Construcción, 2010.
URI
https://hdl.handle.net/2238/6158
Share
       
Metrics
Collections
  • Licenciatura en Ingeniería en Construcción [491]

|Contact us

Repositorio Institucional del Tecnológico de Costa Rica

Sistema de Bibliotecas del TEC | SIBITEC

© DERECHOS RESERVADOS. Un sitio soportado por DSpace(v. 6.3)

RT-1

 

 


|Contact us

Repositorio Institucional del Tecnológico de Costa Rica

Sistema de Bibliotecas del TEC | SIBITEC

© DERECHOS RESERVADOS. Un sitio soportado por DSpace(v. 6.3)

RT-1