Tecnológico de Costa Rica
  • How to publish in Repositorio TEC?
  • Policies
  • Educational Resources
  • Contact us
    • español
    • English
  • English 
    • español
    • English
  • Login
View Item 
  •   Repository Home
  • Trabajos de Graduación
  • Biblioteca José Figueres Ferrer
  • Escuela de Ingeniería en Construcción
  • Licenciatura en Ingeniería en Construcción
  • View Item
  •   Repository Home
  • Trabajos de Graduación
  • Biblioteca José Figueres Ferrer
  • Escuela de Ingeniería en Construcción
  • Licenciatura en Ingeniería en Construcción
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Browse

All RepositoryCommunities & CollectionsBy Issue DateAuthorsTitlesKeywordEducational Resource TypeIntended UserThis CollectionBy Issue DateAuthorsTitlesKeywordEducational Resource TypeIntended User

My Account

LoginRegister

Statistics

View Usage Statistics

Plan de Gestión de Proyecto para el Túnel de Desvío del Río Pirrís

Thumbnail
View/Open
Plan_Gestión_Proyecto_Túnel_Desvío_Río_Pirris.pdf (734.3Kb)
Date
2007
Author
Miranda-Alvarado, Ana Verónica
Metadata
Show full item record
Abstract
The directed professional practice consisted of generating a Plan of Management with a project for the deflection of Pirrís river in the Hydroelectric Project Pirrís, (ICE), by means of a tunnel. This plan consists of being a tool that guides the execution and control, effective ensure communications and establishes the criteria to measure the performance of the project. The plan includes the nine areas of the knowledge, which are: administration of the reach in the project, administration of the time, management of cost, management of the quality, administration of the human resources, management of the risks, administration of the communications, administration of the acquisitions of the project and finally integration. Additionally it was managed to integrate to these nine areas, two new headings that were considered important to obtain a more complete plan of management, these are, administration of the labor security and management of the atmosphere. Also procedures for the control of changes in the plan and the process of acceptance are included when the work is finished. In order to obtain the accomplishment of the plan the tool of the administration of projects was used, which serves to us as guide fundamental to formulate as it must be the suitable development of a project.
Description
Proyecto de Graduación (Licenciatura en Ingeniería en Construcción) Instituto Tecnológico de Costa Rica. Escuela de Ingeniería en Construcción, 2007.
URI
https://hdl.handle.net/2238/6198
Share
       
Metrics
Collections
  • Licenciatura en Ingeniería en Construcción [491]

|Contact us

Repositorio Institucional del Tecnológico de Costa Rica

Sistema de Bibliotecas del TEC | SIBITEC

© DERECHOS RESERVADOS. Un sitio soportado por DSpace(v. 6.3)

RT-1

 

 


|Contact us

Repositorio Institucional del Tecnológico de Costa Rica

Sistema de Bibliotecas del TEC | SIBITEC

© DERECHOS RESERVADOS. Un sitio soportado por DSpace(v. 6.3)

RT-1