Tecnológico de Costa Rica
  • How to publish in Repositorio TEC?
  • Policies
  • Educational Resources
  • Contact us
    • español
    • English
  • English 
    • español
    • English
  • Login
View Item 
  •   Repository Home
  • Trabajos de Graduación
  • Biblioteca José Figueres Ferrer
  • Escuela de Ingeniería en Construcción
  • Licenciatura en Ingeniería en Construcción
  • View Item
  •   Repository Home
  • Trabajos de Graduación
  • Biblioteca José Figueres Ferrer
  • Escuela de Ingeniería en Construcción
  • Licenciatura en Ingeniería en Construcción
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Browse

All RepositoryCommunities & CollectionsBy Issue DateAuthorsTitlesKeywordEducational Resource TypeIntended UserThis CollectionBy Issue DateAuthorsTitlesKeywordEducational Resource TypeIntended User

My Account

LoginRegister

Statistics

View Usage Statistics

Herramienta para la estimación de costos basada en los renglones de pago del CR-2010, para el primer programa de la red vial cantonal PRVC-Préstamo BID No.2098/OC-CR, MOPT-GIZ

Thumbnail
View/Open
herramientaparalaestimaciondecostosbasadaenlosrenglonesdepagodel_cr2010.pdf (1.641Mb)
Date
2015
Author
Araya-Paniagua, María Isabel
Metadata
Show full item record
Abstract
In the present work an analysis of the cost estimating tools used by the consulting agency GIZ (for its acronym in German Deutsche Gesellschaft für Internationale Zusammenarbeit) is made, which works for the MOPT (Ministry of Public Works and Transport) in a program called First program Cantonal Road Network PRVC-Loan BID-No.2098 / OC-CR, MOPT-GIZ, also a new tool for estimating costs as an alternative to the problems encountered option is provided. Some of the activities were conducted studies and assessments to identify weaknesses that have used spreadsheets also select the information to include in their databases, this tool allowed developing cost estimates through Excel. The tool was carried out, using as reference manuals made by ombudsmen MOPT and CONAVI (National Roads Authority). The machinery specialist book called "Contractor's Equipment Cost Guide; MOPT interviews with experts and GIZ were also used. The main and most important conclusion was, obtaining calculation tool, gathering the information obtained throughout its development, as the recommendation to appoint a supervisor to ensure upgrades and implementations was also obtained, which should applied to existing tools and proposals. Keywords:
Description
Proyecto de Graduación (Licenciatura en Ingeniería en Construcción) Instituto Tecnológico de Costa Rica, Escuela de Ingeniería en Construcción, 2015.
URI
https://hdl.handle.net/2238/6206
Share
       
Metrics
Collections
  • Licenciatura en Ingeniería en Construcción [491]

|Contact us

Repositorio Institucional del Tecnológico de Costa Rica

Sistema de Bibliotecas del TEC | SIBITEC

© DERECHOS RESERVADOS. Un sitio soportado por DSpace(v. 6.3)

RT-1

 

 


|Contact us

Repositorio Institucional del Tecnológico de Costa Rica

Sistema de Bibliotecas del TEC | SIBITEC

© DERECHOS RESERVADOS. Un sitio soportado por DSpace(v. 6.3)

RT-1