Tecnológico de Costa Rica
  • ¿Cómo publicar en el Repositorio TEC?
  • Políticas
  • Recursos Educativos
  • Contáctenos
    • español
    • English
  • español 
    • español
    • English
  • Login
Ver ítem 
  •   Página Principal
  • Trabajos de Graduación
  • Biblioteca José Figueres Ferrer
  • Escuela de Ingeniería en Construcción
  • Licenciatura en Ingeniería en Construcción
  • Ver ítem
  •   Página Principal
  • Trabajos de Graduación
  • Biblioteca José Figueres Ferrer
  • Escuela de Ingeniería en Construcción
  • Licenciatura en Ingeniería en Construcción
  • Ver ítem
JavaScript is disabled for your browser. Some features of this site may not work without it.

Listar

Todo el RepositorioComunidades & ColeccionesPor fecha de publicaciónAutoresTítulosPalabras clavesTipo de Recurso EducativoDestinatarioEsta colecciónPor fecha de publicaciónAutoresTítulosPalabras clavesTipo de Recurso EducativoDestinatario

Mi cuenta

AccederRegistro

Estadísticas

Ver Estadísticas de uso

Análisis de rendimiento y productividad de formaleta cilíndrica prefabricada, utilizada en la construcción de columnas del Country Day School

Thumbnail
Ver/
analisis_rendimiento_productividad_formaleta_cilindrica_prefabricada.pdf (4.008Mb)
Fecha
2016
Autor
Zamora-Pereira, Fabiola
Metadatos
Mostrar el registro completo del ítem
Resumen
This project consists in to determine the productivity and performance of the workforce in the process of shuttering columns with circular section, of the Country Day Project School, located in Hacienda Espinal, Alajuela. The Work Sampling technique, which consist constantly observing the activity studied, was used to determine productivity in the process of formwork, determining what percentage of time is productive (PT), contributory (CT) or noncontributory (NCT), and according to the results the workers for this activity take in about 44% TP, 13% of TC and 43% TNC. The Crew Balance methodology was used for the stripping process, which determined an efficiency of 66% for this activity. Besides this, the yields of the 4 necessary sub-activities for making the columns were determined, which are fitting armor 0.023Hr-H / kg, setting the formwork and the accessories 1.49Hr-H / m2, for the pouring of the column was determined that the yield was 4.42Hr-H / m3 and the stripping performance was established by 0.3Hr- H / m2. Since this study is focused in the workforce, brief interviews were made, in which the workers were questioned about the factors that as per their experience reduce the productivity and performance in their daily work.
Descripción
Proyecto de Graduación (Licenciatura en Ingeniería en Construcción) Instituto Tecnológico de Costa Rica, Escuela de Ingeniería en Construcción, 2016.
URI
https://hdl.handle.net/2238/6726
Compartir
       
Métricas
Colecciones
  • Licenciatura en Ingeniería en Construcción [551]

|Contáctenos

Repositorio Institucional del Tecnológico de Costa Rica

Sistema de Bibliotecas del TEC | SIBITEC

© DERECHOS RESERVADOS. Un sitio soportado por DSpace(v. 6.3)

RT-1

 

 


|Contáctenos

Repositorio Institucional del Tecnológico de Costa Rica

Sistema de Bibliotecas del TEC | SIBITEC

© DERECHOS RESERVADOS. Un sitio soportado por DSpace(v. 6.3)

RT-1