Tecnológico de Costa Rica
  • How to publish in Repositorio TEC?
  • Policies
  • Educational Resources
  • Contact us
    • español
    • English
  • English 
    • español
    • English
  • Login
View Item 
  •   Repository Home
  • Trabajos de Graduación
  • Biblioteca José Figueres Ferrer
  • Escuela de Ingeniería en Construcción
  • Licenciatura en Ingeniería en Construcción
  • View Item
  •   Repository Home
  • Trabajos de Graduación
  • Biblioteca José Figueres Ferrer
  • Escuela de Ingeniería en Construcción
  • Licenciatura en Ingeniería en Construcción
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Browse

All RepositoryCommunities & CollectionsBy Issue DateAuthorsTitlesKeywordEducational Resource TypeIntended UserThis CollectionBy Issue DateAuthorsTitlesKeywordEducational Resource TypeIntended User

My Account

LoginRegister

Statistics

View Usage Statistics

Análisis de productividad en procesos de armadura en el proyecto The IVY de la empresa Edica Ltda

Thumbnail
View/Open
analisis_productividad_procesos_armadura_proyecto_the_ivy.pdf (3.966Mb)
apendices.pdf (3.795Mb)
Date
2016
Author
Montiel-Romero, Ana
Metadata
Show full item record
Abstract
The following briefing introduces a collaborative improvement to the activities and processes used at Edica Ltda, to the production of armor for reinforced concrete elements. In order to achieve this goal, the building project named The IVY was selected, this project consists in the development, both horizontal and vertical, of habitable houses. The data gathered from this building project was of mayor importance to realize a full analysis of the methodology used, and to elaborate process improvements, to study their productivity, obtained from critical activities, and to detect those factors responsible of causing low efficiency problems. To do this, it was necessary to build the provisional structures in order to detect site's design flaws. Other tools were also used, like surveys, tours diagrams, and productivity measuring, by using techniques like Work Sampling, Five Minute Rating and Crew Balance, applied to the installation of mezzanine floors, beams manufacturing and walls building. While analyzing these results, it was of great importance to elaborate an adequate planning and organization of the site, previous to the beginning of the construction tasks. Also, the establishment of the most efficient processes sequence in order to achieve an excellent steel product quality. It was also important to perform regular inspections on the workers, as well as to evaluate the applied methods. Finally, a group of recommendations were made to prevent the same flaws to affect future building projects
Description
Proyecto de Graduación (Licenciatura en Ingeniería en Construcción) Instituto Tecnológico de Costa Rica, Escuela de Ingeniería en Construcción, 2016.
URI
https://hdl.handle.net/2238/6727
Share
       
Metrics
Collections
  • Licenciatura en Ingeniería en Construcción [491]

|Contact us

Repositorio Institucional del Tecnológico de Costa Rica

Sistema de Bibliotecas del TEC | SIBITEC

© DERECHOS RESERVADOS. Un sitio soportado por DSpace(v. 6.3)

RT-1

 

 


|Contact us

Repositorio Institucional del Tecnológico de Costa Rica

Sistema de Bibliotecas del TEC | SIBITEC

© DERECHOS RESERVADOS. Un sitio soportado por DSpace(v. 6.3)

RT-1