Tecnológico de Costa Rica
  • ¿Cómo publicar en el Repositorio TEC?
  • Políticas
  • Recursos Educativos
  • Contáctenos
    • español
    • English
  • español 
    • español
    • English
  • Login
Ver ítem 
  •   Página Principal
  • Trabajos de Graduación
  • Biblioteca José Figueres Ferrer
  • Escuela de Ingeniería en Construcción
  • Licenciatura en Ingeniería en Construcción
  • Ver ítem
  •   Página Principal
  • Trabajos de Graduación
  • Biblioteca José Figueres Ferrer
  • Escuela de Ingeniería en Construcción
  • Licenciatura en Ingeniería en Construcción
  • Ver ítem
JavaScript is disabled for your browser. Some features of this site may not work without it.

Listar

Todo el RepositorioComunidades & ColeccionesPor fecha de publicaciónAutoresTítulosPalabras clavesTipo de Recurso EducativoDestinatarioEsta colecciónPor fecha de publicaciónAutoresTítulosPalabras clavesTipo de Recurso EducativoDestinatario

Mi cuenta

AccederRegistro

Estadísticas

Ver Estadísticas de uso

Productividad y rendimiento de mano de obra para algunos procesos constructivos seleccionados en la ejecución del edificio ISLHA del ITCR

Thumbnail
Ver/
productividad_rendimiento_procesos_constructivos_islha.pdf (5.562Mb)
ISLHA-apendice.pdf (5.111Mb)
Base_de_datos_con_Rendimientos.accdb (1.074Mb)
Fecha
2016
Autor
Padilla-Bonilla, Alejandra Amada
Metadatos
Mostrar el registro completo del ítem
Resumen
This project consists in performances and productivities determination in "core and shell" constructive activities, related to "Núcleo Integrado de Seguridad Laboral e Higiene Ambiental" building (ISLHA), which is under design, coordination an inspection of Engineering Office at Tecnológico de Costa Rica. At first, activities due to analyze were identified by a cost and criticality study. Samplings were taken to obtain productivity and performance data of processes related to those activities, which let determine there is no specific relationship among productivity and performance. This is because sometimes labors are done in an efficient way, but not in an effective one, or vice versa. The main factors affecting these variables were related to site design and workmanship. Performance data is now in a data bases (register) that let speed up the Engineering Office tasks, and with productivity ones a better control can be demanded on workers job, due to minimize costs related with this factor. It was realized a requirements study based on specifications and construction drawings for the chosen activities, this generated a quality check list in order to speed up inspection tasks and guarantee built elements quality.
Descripción
Proyecto de Graduación (Licenciatura en Ingeniería en Construcción) Instituto Tecnológico de Costa Rica, Escuela de Ingeniería en Construcción, 2016.
URI
https://hdl.handle.net/2238/6732
Compartir
       
Métricas
Colecciones
  • Licenciatura en Ingeniería en Construcción [552]

|Contáctenos

Repositorio Institucional del Tecnológico de Costa Rica

Sistema de Bibliotecas del TEC | SIBITEC

© DERECHOS RESERVADOS. Un sitio soportado por DSpace(v. 6.3)

RT-1

 

 


|Contáctenos

Repositorio Institucional del Tecnológico de Costa Rica

Sistema de Bibliotecas del TEC | SIBITEC

© DERECHOS RESERVADOS. Un sitio soportado por DSpace(v. 6.3)

RT-1