Tecnológico de Costa Rica
  • How to publish in Repositorio TEC?
  • Policies
  • Educational Resources
  • Contact us
    • español
    • English
  • English 
    • español
    • English
  • Login
View Item 
  •   Repository Home
  • Trabajos de Graduación
  • Biblioteca José Figueres Ferrer
  • Escuela de Ingeniería en Construcción
  • Licenciatura en Ingeniería en Construcción
  • View Item
  •   Repository Home
  • Trabajos de Graduación
  • Biblioteca José Figueres Ferrer
  • Escuela de Ingeniería en Construcción
  • Licenciatura en Ingeniería en Construcción
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Browse

All RepositoryCommunities & CollectionsBy Issue DateAuthorsTitlesKeywordEducational Resource TypeIntended UserThis CollectionBy Issue DateAuthorsTitlesKeywordEducational Resource TypeIntended User

My Account

LoginRegister

Statistics

View Usage Statistics

Aplicación de Lean Construction a través de la metodología Last Planner a proyectos de vivienda social de FUPROVI

Thumbnail
View/Open
Aplicacion_ lean_construction_metodologia_last_planner.pdf (3.021Mb)
Date
2017
Author
Alpízar-Ávalos, Greivin de los Ángeles
Metadata
Show full item record
Abstract
The present paper consists on the final report of the graduation project, which consisted on designing the procedure for the application of Last Planner System® (LPS) and perform a pilot application on a project under construction from the Housing Developer Foundation (FUPROVI for its acronym in Spanish). Last Planner System® is a methodology for planning, monitoring and control of construction projects, which is created product of the development of the Lean Construction philosophy, this allows to improve deadlines and costs. The main objective of the project was to optimize the planning, monitoring and control process of the FUPROVI’s construction works through the design of the application’s procedure. In order to complete this it was carried out a bibliographic investigation, the execution of the projects by the Foundation were studied and based on this analysis it was set the procedure for the LPS application. Among the most important results it was shown that the LPS application allows to determine the delay causes in the activities in aimed at its solution in order to execute improvements. The most important conclusion after the project was completed is that the three level planning that have the LPS application are essential to obtain a more fluid and constant workflow.
Description
Proyecto de Graduación (Licenciatura en Ingeniería en Construcción) Instituto Tecnológico de Costa Rica. Escuela de Ingeniería en Construcción, 2017.
URI
https://hdl.handle.net/2238/7272
Share
       
Metrics
Collections
  • Licenciatura en Ingeniería en Construcción [552]

|Contact us

Repositorio Institucional del Tecnológico de Costa Rica

Sistema de Bibliotecas del TEC | SIBITEC

© DERECHOS RESERVADOS. Un sitio soportado por DSpace(v. 6.3)

RT-1

 

 


|Contact us

Repositorio Institucional del Tecnológico de Costa Rica

Sistema de Bibliotecas del TEC | SIBITEC

© DERECHOS RESERVADOS. Un sitio soportado por DSpace(v. 6.3)

RT-1