Buscar
Mostrando ítems 251-260 de 275
ANÁLISIS DEL PROCESO DE PRODUCCIÓN Y ACARREO DE LOS CONCRETOS ASOCIADOS A LA CONSTRUCCIÓN DEL P.H. REVENTAZÓN DEL ICE
(Instituto Tecnológico de Costa Rica, 2011)
The project is to establish the location of five concrete plants to optimize resources in the development of construction works within the PHR, from the use of databases, statistics, documentation, proposal and analysis ...
Propuesta de protocolo para la correcta aplicación de fibra de carbono en losas de concreto en la readecuación de puentes
(Instituto Tecnológico de Costa Rica, 2018)
The lack of a permanent process of maintenance for bridges in Costa Rica, for many years and the increasing of the capacity of transport vehicles have had a significant impact that had damaged some structures which were ...
Control de costos en edificio de tres niveles
(Instituto Tecnológico de Costa Rica, 2017)
The purpose of this study is to improve and strengthen the cost control system of Grupo Condeco Vac S.A. The development starts with an analysis of the actual situation of the company this was generated with a compilation ...
Herramienta para la estimación de costos en la construcción de viviendas para la empresa Fomento Urbano S.A.
(Instituto Tecnológico de Costa Rica, 2011)
Este trabajo fue realizado con el objetivo de
desarrollar una herramienta de estimación de
costos en la construcción de viviendas para la
empresa Fomento Urbano S.A.
Para lograr esto, se creó una base de
datos, ...
Guía para procedimientos de trámite de permisos en proyectos infraestructura hospitalaria para la CCSS
(Instituto Tecnológico de Costa Rica, 2012)
The construction of hospital infrastructures represents a great challenge from the planning stage, execution, pursuit, control and closes, since interdisciplinary equipment like doctors, architects, engineers and other ...
Dimensionamiento de la estructura de pavimento en la Calle 1 de San Isidro, Pérez Zeledón, utilizando la metodología mecanística empírica para diseño de pavimentos y creación de un plan de conservación
(Instituto Tecnológico de Costa Rica, 2018)
To determine the structure of the pavement to be used in "Calle 1" of San Isidro, Pérez Zeledón the design of three types of flexible, semi-rigid, rigid pavements is proposed. These are designed by the mechanistic-empirical ...
Evaluación para la Rehabilitación del Puente de Calle Prusia
(Instituto Tecnológico de Costa Rica, 2012)
The evaluation for the rehabilitation of the bridge
at Prusia Street is essential for the community,
due to its touristic and agricultural importance. It
must determine the maximum load that should
carry the bridge and ...
Control de calidad de los procesos constructivos de los cuartos limpios del Proyecto Edwards
(Instituto Tecnológico de Costa Rica, 2018)
El control de calidad durante los procesos constructivos de las obras civiles permite ofrecer altos estándares en las empresas constructoras, satisfacción de los clientes y son determinantes en el éxito del proyecto.
Este ...
Efecto de la variación de la relación polvo / asfalto sobre la durabilidad de mezclas asfálticas
(Instituto Tecnológico de Costa Rica, 2016)
The question that motivated this research was the need to know if the ratio of mineral dust / effective asphalt content is a relevant parameter by itself, not by correlation with other properties, since currently the ...
Guía para la gestión del alcance, tiempo y costo de los proyectos de Desarrollos Mega
(Instituto Tecnológico de Costa Rica, 2018)
The present proposal of the graduation project has as a general objective the preparation of a guide for the administration of the scope, time and cost of the construction projects of the organization Desarrollos Mega, ...