Buscar
Mostrando ítems 1-10 de 15
Análisis, diseño y proceso constructivo de un puente de hasta 15m
(Instituto Tecnológico de Costa Rica, 2012)
Analysis and design of a bridge construction
process up to 15m main objective seeks to take
into account the conditions and variables that
interfere when developing a structure of this type.
Within these variables ...
Metodología para la evaluación de la seguridad estructural de puentes
(Instituto Tecnológico de Costa Rica, 2018)
The objective of the present work is to show the methodology to perform a reliability analysis in a prestressed concrete girder bridge, based on deformation data obtained from a diagnostic load test.
It was developed three ...
Inventario e inspección de 10 puentes ubicados en las rutas cantonales de San Ramón de Alajuela
(Instituto Tecnológico de Costa Rica, 2018)
The main objective of this work is to inventory and inspect ten bridges belonging to roadways which are administered by San Ramon’s Municipal Administration. The bridges are located at San Rafael and Santiago districts. ...
Comparación del comportamiento sismo-resistente en puentes viga simple de acero con uso de aisladores de base con y sin núcleo de plomo
(Instituto Tecnológico de Costa Rica, 2017)
In the following document, a series of stages and
procedures are going to be developed to analyze
and compare the current and possible behavior of
bridges to the effect of seismic excitations,
through possible modifications ...
Guía para la revisión de diseños de puentes de la Unidad Ejecutora del Primer Programa de Infraestructura Vial (UE-PIV 1)
(Instituto Tecnológico de Costa Rica, 2017)
Currently the development of road infrastructure in Costa Rica is having a significant boom due to the need to improve the service level of the national red road infrastructure. Vehicle bridges call for a large part of ...
Evaluación y clasificación de patologías que influyen en la vida útil de las losas de concreto en puentes.
(Instituto Tecnológico de Costa Rica, 2017)
Determining the service life of bridges depends on the type of structure, materials and applied loads. It is a complicated subject that requires a detailed analysis that involves all these factors.
In this case, the problem ...
Modelaje no lineal de metodología de reparación y rehabilitación de la Pila N°3 del puente sobre el Río Grande de Tárcoles en la Ruta N°34 mediante FRP
(Instituto Tecnológico de Costa Rica, 2017)
The main purpose of this project is the simulation with nonlinear modeling tools of a repair methodology of a post-tensioned bridge pier by means of Fiber Reinforced Polymer Sheets (CFRP).
From the detailed study carried ...
Manual para el mantenimiento de puentes en Costa Rica
(Instituto Tecnológico de Costa Rica, 2019)
El presente proyecto consiste en proponer un
manual para el mantenimiento de los puentes en
Costa Rica, considerando los daños más comunes
identificados en el inventario nacional de puentes.
Para la realización de este ...
Propuesta de actividades de intervención y costos unitarios para la atención de los daños de la Red de Puentes de El Guarco
(Instituto Tecnológico de Costa Rica, 2019)
El objetivo principal del trabajo es Facilitar a la UTGVM de El Guarco de actividades y costos unitarios de intervención de la Red de Puentes para el Plan de Conservación y Desarrollo Vial Cantonal 2021-2026. El plan actual ...
Seismic performance of SMA-Reinforced ECC pier system of the Salitral Bridge
(Instituto Tecnológico de Costa Rica, 2019)
Los emergentes materiales inteligentes cambian el paradigma de diseño de la etapa de no-colapso a no-daño después de cargas extremas y uso inmediato. La aleación Nitinol con memoria de forma súper-elásticas (SMA) es un ...