Evaluación de la vulnerabilidad sísmica en viviendas y edificios comerciales menores en el área central de Pérez Zeledón, Costa Rica
(Instituto Tecnológico de Costa Rica, 2016)
The main purpose of this project is the realization of an engineering study that will serve to determine and publicize the seismic hazard in the canton of Pérez Zeledón, as well as the different levels of seismic vulnerability ...
Análisis de productividad en procesos de armadura en el proyecto The IVY de la empresa Edica Ltda
(Instituto Tecnológico de Costa Rica, 2016)
The following briefing introduces a collaborative improvement to the activities and processes used at Edica Ltda, to the production of armor for reinforced concrete elements. In order to achieve this goal, the building ...
Aplicación de los códigos QR en el control de bodegas
(Instituto Tecnológico de Costa Rica, 2016)
6
The project will involve the implementation of the QR code in the construction industry by applying it to the administration and control of wine.
The QR code (quick response code, for its acronym in English, quick ...
Actualización del sistema de revisión de precios del mercado enfocado a remodelaciones de obras del Banco Nacional
(Instituto Tecnológico de Costa Rica, 2016)
In collaboration with the Price revision system of
The National Bank, a study of construction market
as well as the adjustment of its budgeting tool in
order to improve its administrative contractive
processes.
To ...
Análisis, comparación y diseño optimizado para muros de Contención
(Instituto Tecnológico de Costa Rica, 2016)
Retaining walls are structural elements used to
contain masses of soil, which are being analyzed
in this document are mainly compound of two
elements, the stem and the base plate.
There are many types and designs of ...
Análisis de los procesos constructivos en las actividades de chorrea, encofrado y desencofrado de muros y columnas en el proyecto QBO Skyhomes de la empresa H Solís.
(Instituto Tecnológico de Costa Rica, 2016)
The issue of productivity in construction in Costa
Rica has been in progress over time but still lack
knowledge about it. It is worth mentioning that not
only sufficient for a process to be executed quickly,
since it ...
Ejecución de la construcción del reforzamiento del edificio del centro comercial Plaza Wong
(Instituto Tecnológico de Costa Rica, 2016)
This final graduation project entitled
"Implementation of the construction of the
reinforcement of the building of the Plaza Wong
shopping center" is an informative document
about the construction process necessary to ...