Propuesta para el Control de Costos en la empresa constructora KVA Ingeniería de Centroamérica S.A.
(Instituto Tecnológico de Costa Rica., 2016)
According to the problems found in the Enterprise KVA Ingeniería de Centroamérica S.A. in terms of control of costs, it has been done a practice. This practice will allow to identify weaknesses in the company and find ...
Actualización del sistema de revisión de precios del mercado enfocado a remodelaciones de obras del Banco Nacional
(Instituto Tecnológico de Costa Rica, 2016)
In collaboration with the Price revision system of
The National Bank, a study of construction market
as well as the adjustment of its budgeting tool in
order to improve its administrative contractive
processes.
To ...
Análisis, comparación y diseño optimizado para muros de Contención
(Instituto Tecnológico de Costa Rica, 2016)
Retaining walls are structural elements used to
contain masses of soil, which are being analyzed
in this document are mainly compound of two
elements, the stem and the base plate.
There are many types and designs of ...
Aplicación de los códigos QR en el control de bodegas
(Instituto Tecnológico de Costa Rica, 2016)
6
The project will involve the implementation of the QR code in the construction industry by applying it to the administration and control of wine.
The QR code (quick response code, for its acronym in English, quick ...
Análisis de los procesos constructivos en las actividades de chorrea, encofrado y desencofrado de muros y columnas en el proyecto QBO Skyhomes de la empresa H Solís.
(Instituto Tecnológico de Costa Rica, 2016)
The issue of productivity in construction in Costa
Rica has been in progress over time but still lack
knowledge about it. It is worth mentioning that not
only sufficient for a process to be executed quickly,
since it ...
Análisis de productividad en procesos de armadura en el proyecto The IVY de la empresa Edica Ltda
(Instituto Tecnológico de Costa Rica, 2016)
The following briefing introduces a collaborative improvement to the activities and processes used at Edica Ltda, to the production of armor for reinforced concrete elements. In order to achieve this goal, the building ...
Ejecución de la construcción del reforzamiento del edificio del centro comercial Plaza Wong
(Instituto Tecnológico de Costa Rica, 2016)
This final graduation project entitled
"Implementation of the construction of the
reinforcement of the building of the Plaza Wong
shopping center" is an informative document
about the construction process necessary to ...
Comparación de las estructuras de pavimento rígido y flexible por medio de un análisis de ciclo de vida, enfocado a carreteras de tránsito pesado
(Instituto Tecnológico de Costa Rica., 2016)
This project aims to perform a comparison between rigid pavement and flexible pavement, applied to the case of the recently completed road Cañas-Liberia, through a life cycle analysis. Within this analysis, the initial ...
Inspección y seguimiento del proyecto Sede de área de Salud de Barva de Heredia desarrollado por la Caja Costarricense de Seguro Social.
(Instituto Tecnológico de Costa Rica, 2016)
This report of the professional practice shows a
proposal of an improvement in the inspection
process in the area of Direction of Architecture
and Engineering (DAI) of Caja Costarricense de
Seguro Social in their ...
Estudio de productividad en la instalación de paredes livianas y repello en paredes de concreto armado del Nuevo Edificio de Residencias del TEC
(Instituto Tecnológico de Costa Rica, 2016)
The research aims, collect reliable data from the Costa Rican construction, through the study methodology of work and to generate a database that can be used for the benefit of the construction industry, the study takes ...