Buscar
Mostrando ítems 131-140 de 142
Elaboración de un Programa de Mantenimiento Preventivo basado en RCM para la Ranuradora y Molduradora en PLYCEM CONSTUSISTEMAS.
(Instituto Tecnológico de Costa Rica, 2015)
The aim of this project is to improve the grooving and molding equipment availability by reducing the time spent during mechanical and electrical breakdowns. It is important to mention that proactive actions were established ...
Diseño del sistema eléctrico, análisis de cortocircuito y estudio de arco eléctrico para nueva planta de MATRA
(Instituto Tecnológico de Costa Rica, 2017)
In this document it is shown the steps taken to make the electrical design of the new productive plant of MATRA, located in El Coyol, Alajuela, taking into consideration not only the office electrical load, but also the ...
Ahorro de energía en el sistema de aire comprimido, siguiendo el Programa Lean Energy de Baxter Productos Médicos
(Instituto Tecnológico de Costa Rica, 2016)
The project was developed in the company Baxter Medical Products, medical device manufacturing company located in the industrial park of Cartago and was to develop proposals for energy saving compressed air system. The ...
Revisar el programa de mantenimiento preventivo para encontrar oportunidades de mejora e incorporación de las bases del mantenimiento autónomo como introducción al TPM
(Instituto Tecnológico de Costa Rica, 2015)
The manufacture of high precision components requires highly efficient staff and machinery. Oberg machines have the ability to create parts with tolerances of the order of millionths of an inch. However, the maintenance ...
Implementación de pilares del TPM en la empresa Zollner Electronics Costa Rica Ltda
(Instituto Tecnológico de Costa Rica, 2017)
The maintenance management in the companies should be involved on the reduction of losses, wastes and breakdowns so that together with other areas, they progress towards a lean manufacturing company as Zollner Electronics ...
Evaluación del sistema hidráulico de agua potable de Alimentos Prosalud
(Instituto Tecnológico de Costa Rica, 2014)
With the passage of time Alimentos Prosalud has made variations in their production processes, new equipment has been installed and there have been movements at the location of the existing equipment. The installation and ...
Implementar la Metodología de las Mejoras Enfocadas (16 Grandes pérdidas) para la sección de Subdivisión y empaque de la empresa STEIN CORP
(Instituto Tecnológico de Costa Rica, 2017)
The project aims to increase the availability delivered by the Engineering Department to the Subdivision and packaging section of the STEIN CORP, Cartago plant. By decreasing the large losses defined by the TPM. For this ...
Diseño de sistema de supresión de incendios de agua nebulizada en un edificio de varios niveles en un ingenio azucarero y comparación con sistema prediseñado de gabinetes
(Instituto Tecnológico de Costa Rica, 2017)
Water mist fire suppression systems have been under constant investigation for the last decades; however, there is still no definitive standard that provides all the parameters for its design, installation and maintenance. ...
Diseño de un Sistema de Gestión de Mantenimiento para la empresa Laboratorio Óptico TOPEX S.A.
(Instituto Tecnológico de Costa Rica, 2017)
Debido a la competencia actual en el mercado y los altos estándares de calidad, algunas empresas a nivel mundial buscan la manera de optimizar los costos de producción, sin perjudicar la calidad del producto final, evitando ...
Evaluación y rediseño de la red de distribución de aire comprimido de la empresa Extralum
(Instituto Tecnológico de Costa Rica, 2017)
Currently, companies are in search of the continuous improvement of their production lines; this is why companies like Extralum seek to maximize the efficiency of their systems in order to increase their productivity and ...