Buscar
Mostrando ítems 21-30 de 41
Diseño del sistema de acondicionamiento de aire para las oficinas administrativas del edificio municipal de Corredores
(Instituto Tecnológico de Costa Rica, 2018)
Corredores canton, located in Puntarenas generally presents very high and uncomfortable temperatures to work in an office. Due to this, the main purpose of this project is the design of an air conditioning system of the ...
Diseño de un modelo de gestión de Mantenimiento para una central hidroeléctrica de 18MW
(Instituto Tecnológico de Costa Rica, 2018)
In recent years the prices in the regional energy market have had a downward
trend, forcing companies related to this sector to introduce improvements that reduce
production costs and optimize the use of resources and ...
Diseño del sistema fijo contra incendios para el Edificio de Oficinas Centrales del Benemérito Cuerpo de Bomberos de Costa Rica
(Instituto Tecnológico de Costa Rica, 2018)
This specialty practice report is a step-by-step design and calculations for a
complete fire protection system based on automatic sprinklers. The design was
made for the Building of Central Offices of the Fire Department ...
Diseño de un Modelo de Gestión de Mantenimiento para la empresa Lanco & Harris Manifacturing
(Instituto Tecnológico de Costa Rica, 2018)
The project is develop in a paint company called Lanco & Harris Manufacturing
Corporation, located in Coyol of Alajuela, and seeks to develop a Management Model
that helps the Maintenance Department to align its objectives ...
Análisis técnico para la construcción de una planta de generación solar para JASEC
(Instituto Tecnológico de Costa Rica, 2018)
In this work, a feasibility study is developed that focuses on the design of a photo-voltaic solar power plant, using mono-crystalline panels with bifacial technology, in an empty area of the JASEC company. The project ...
Establecimiento y validación del Modelo Tarifario de ARESEP de Operación y Mantenimiento para Auto Transportes LUMACA S.A.
(Instituto Tecnológico de Costa Rica, 2018)
The public transport industry of people is mostly governed by practical empirical
knowledge in decision making where numerical values are not usually considered in
the maintenance of the units, ignoring them and being ...
Actualización de la gestión del mantenimiento en secciones de crudo y horno en la planta CEMEX Colorado de Abangares.
(Instituto Tecnológico de Costa Rica, 2016)
Now a days, large companies or even SMEs have tried to improve their
processes and increase their profits through a good maintenance management, since
many years maintenance has been stopped seeing as a department ...
Diseño del sistema de acondicionamiento de aire para el Auditorio Judicial Miguel Blanco Quirós del Organismo de Investigación Judicial
(Instituto Tecnológico de Costa Rica, 2017)
The purpose of this project is to design the air conditioning system for the Miguel Blanco Quirós Judicial Auditorium of the OIJ, whose problem is that there is currently a system that does not comply with the environmental ...
Diseño de un modelo de gestión de mantenimiento para el Taller Electromecánico del Instituto Costarricense de Ferrocarriles (INCOFER) División Pacífico”
(Instituto Tecnológico de Costa Rica, 2017)
Public transport is a fundamental piece in the field of urban mobility, in Costa Rica, the railroad has regained the attention of citizens as a viable alternative to move between the congested cities that make up the Great ...
Refrigerante natural como alternativa para la climatización hotelera, analizando desde el ámbito ambiental, energético, eficiencia y económico.
(Instituto Tecnológico de Costa Rica, 2018)
Among refrigeration systems, air conditioning equipment is the one that generates the most problems in terms of environment and energy. For this reason, maximizing the energy efficiency of these equipment and at the same ...