Diseño de un Modelo de Gestión de Mantenimiento para la empresa Lanco & Harris Manifacturing
(Instituto Tecnológico de Costa Rica, 2018)
The project is develop in a paint company called Lanco & Harris Manufacturing
Corporation, located in Coyol of Alajuela, and seeks to develop a Management Model
that helps the Maintenance Department to align its objectives ...
Análisis técnico para la construcción de una planta de generación solar para JASEC
(Instituto Tecnológico de Costa Rica, 2018)
In this work, a feasibility study is developed that focuses on the design of a photo-voltaic solar power plant, using mono-crystalline panels with bifacial technology, in an empty area of the JASEC company. The project ...
Desarrollo de una propuesta de un sistema de carga interno para vehículos eléctricos
(Instituto Tecnológico de Costa Rica, 2018)
The purpose of this project is the design of a boost converter (Boost) with correction of the power factor, which will serve as the basis for the proposal of an internal charging system of an electric vehicle, that can be ...
Establecimiento y validación del Modelo Tarifario de ARESEP de Operación y Mantenimiento para Auto Transportes LUMACA S.A.
(Instituto Tecnológico de Costa Rica, 2018)
The public transport industry of people is mostly governed by practical empirical
knowledge in decision making where numerical values are not usually considered in
the maintenance of the units, ignoring them and being ...
Diseño de un sistema de distribución de agua para la instalación de hidrantes en la Sede Central del Instituto Tecnológico de Costa Rica
(Instituto Tecnológico de Costa Rica, 2016)
This report details the implemented procedure to design a water supply and
distribution network to provide hydrants at the headquarters of the Technological
Institute of Costa Rica. The project includes the detection of ...
Rediseño de la instalación eléctrica de la oficina del Banco de Costa Rica del Barrio el Carmen, San José
(Instituto Tecnológico de Costa Rica, 2016)
The branch of the Bank of Costa Rica located in the Carmen district, San Jose, has an
obsolete electrical installation that does not meet the regulations of the National
Electrical Code.
Among the anomalies found no ...
Diseño del sistema de gestión de mantenimiento para equipo de refrigeración y aire acondicionado en Grupo Poulton
(Instituto Tecnológico de Costa Rica, 2016)
A design of a maintenance model is made for the company Poulton Ingeniería,
responsible for providing maintenance services in refrigeration and air conditioning.
The design is based on the PAS55 standard for asset ...
Actualización de la gestión del mantenimiento en secciones de crudo y horno en la planta CEMEX Colorado de Abangares.
(Instituto Tecnológico de Costa Rica, 2016)
Now a days, large companies or even SMEs have tried to improve their
processes and increase their profits through a good maintenance management, since
many years maintenance has been stopped seeing as a department ...
Desarrollo de la estructura necesaria para la implementación de un modelo de toma de decisiones para mantenimiento basado en el deterioro multiestado para el parque eólico Los Santos.
(Instituto Tecnológico de Costa Rica, 2016)
This project seeks to determine the structure necessary for the implementation of a
decision making model for maintenance at the Windfarm Los Santos, which has 15
wind turbines G52-850 kW.
It starts with the analysis ...
Sistema de Control Automático y Monitorización del Sistema de Suministro de Agua de la Planta Este de Trimpot Electrónicas Ltda.
(Instituto Tecnológico de Costa Rica, 2016)
The Project was made in TRIMPOT ELECTRONICAS Ltda. This is an
electronical components manufacturing enterprise. The East plant has a water
supply system conformed by a deep well pump which feeds two capture tanks
automatically ...