Tecnológico de Costa Rica
  • How to publish in Repositorio TEC?
  • Policies
  • Educational Resources
  • Contact us
    • español
    • English
  • English 
    • español
    • English
  • Login
View Item 
  •   Repository Home
  • Trabajos de Graduación
  • Biblioteca José Figueres Ferrer
  • Escuela de Ingeniería Electromecánica
  • Licenciatura en Mantenimiento Industrial
  • View Item
  •   Repository Home
  • Trabajos de Graduación
  • Biblioteca José Figueres Ferrer
  • Escuela de Ingeniería Electromecánica
  • Licenciatura en Mantenimiento Industrial
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Browse

All RepositoryCommunities & CollectionsBy Issue DateAuthorsTitlesKeywordEducational Resource TypeIntended UserThis CollectionBy Issue DateAuthorsTitlesKeywordEducational Resource TypeIntended User

My Account

LoginRegister

Statistics

View Usage Statistics

Remodelación de la red de distribución eléctrica de media tensión para el servicio de urgencias del Hospital Dr. Fernando Escalante Pradilla

Thumbnail
View/Open
Remodelacion_red_distribucion_electrica_.pdf (16.72Mb)
Date
2016
Author
Fallas-Cordero, Diego Armando
Metadata
Show full item record
Abstract
The execution of this reshuffle will take place in Escalante Pradilla Hospital Dr. Fernando Pérez Zeledón. This is done in order to adapt the electrical design of hospital infrastructure extensions.The system consists of a network of overhead power distribution and other underground. The medium voltage network of 34.5 KV hospital requires the installation of two new transformers for the new burdens that are needed in the Emergency Service. Installing new building loads Emergency strengthen the system requires medium voltage equipment demand. The second part of the project consists of a montage of underground lines that are within the hospital. This network of underground medium voltage must reach an internal substation and then derived three transformers to feed pedestal. For better understanding the needs of the hospital, an analysis of the current situation of medium voltage system feeding the hospital is done. This allows to analyze and understand the existing aerial installation that feeds the hospital. The underground distribution will be installed in its new majority. Then a layout design and assembly of the posts forming the airlines is performed. In the same way the calculations are set to pay underground medium voltage distribution transformers that feed. The budget that the project requires for its implementation, which corresponds to US $ 81,000 triphasic. This includes airlines, the air transition, underground lines.This cost is presented in order to justify the construction of the work that needs Hospital.
Description
Proyecto de Graduación (Licenciatura en Ingeniería en Mantenimiento Industrial) Instituto Tecnológico de Costa Rica, Escuela de Ingeniería Electromecánica, 2016.
URI
http://hdl.handle.net/2238/6596
Share
       
Metrics
Collections
  • Licenciatura en Mantenimiento Industrial [227]

|Contact us

Repositorio Institucional del Tecnológico de Costa Rica

Biblioteca José Figueres Ferrer | TEC Digital

© DERECHOS RESERVADOS. Un sitio soportado por DSpace(v. 5.5)

RT-1

 

 


|Contact us

Repositorio Institucional del Tecnológico de Costa Rica

Biblioteca José Figueres Ferrer | TEC Digital

© DERECHOS RESERVADOS. Un sitio soportado por DSpace(v. 5.5)

RT-1